My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3311 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
3311
>
3311 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 2:54:57 PM
Creation date
2/20/2017 8:48:44 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
3311
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A�x <br />syv� <br />H �� <br />� H� <br />"�d N'il <br />V1 M <br />�O�H <br />��g <br />�Y n <br />t� y � <br />t-+ H <br />gy <br />C� CC y <br />� y t�/� <br />x <br />, c9 <br />p, <br />n <br />� <br />%� <br />Auqust 15, 1991 <br />Mr. Bob Norling <br />G-C126 <br />Page 14 <br />a free-draining washed rock, pea gravel, or other free-draininq <br />granular material. The subdrain line should be tightlined to <br />discharge into a permanent storm drain. <br />Under no circumstances should roof downspout drain lines be <br />connected to the garage wall subdrain system. All roof downspouts <br />must be separately tightlined to discharge into a storm drain <br />system. We recommend that sufficient cleanouts be installed at <br />strategic locations to allow for periodic maintenance of the garage <br />wall subdrains and the downspout tightline systems. <br />LIMITATIONB <br />Oanaral <br />�.� i.� Our recommendations and conclusions are based on the site materials <br />� � i' observed, selective laboratory testing and enqineering analyses, <br />and our experience and engineering judqement. The conclusions and <br />�'� �'� " recommendations are professional opinions derived in a manner <br />�'� consistent with that level of care and skill ordinarily exercised <br />by other members of the profession currently practicinq under <br />�,� similar conditions in this area. No warranty is expressed or <br />implied. <br />�� ` <br />� � <br />i" <br />� � <br />1 I�'j <br />"` The recommendations submitted in this letter report are based upon <br />the soil conditions observed on the existing excavation. Soil and <br />i� groundwater conditions may vary from those observed. The nature <br />and the extent of variations may not become evident until <br />construction. if variations appear then, GCI should be requested <br />�' to re-evaluate the recommendations of this report and to verify or <br />modify them in writing prior to proceeding with the construction. <br />�ti <br />i <br />. <br />cieo consultaate inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.