Laserfiche WebLink
;: <br />7' <br />j.. <br />f. � <br />, <br />r �: <br />;. <br />¢-� <br />,a <br />-i <br />�.. <br />F <br />�.: <br />�� <br />!•: <br />� <br />�.`: <br />� <br />q <br />., <br />y <br />:; <br />I>� <br />:; <br />'=1 <br />`.: <br />-. <br />q <br />i <br />p <br />a <br />.•, <br />Beam Construction, Inc. <br />November 1, 1990 <br />Page three <br />everett ; <br />i ��� <br />i <br />�.�� � <br />In order for the processing of your application to continue, it will be <br />necessary to provide the Building Department with two complete new sets of <br />drawings reflecting the corrections requested. <br />Upon resubmittal of the drawings, your application will be given priority and <br />plan review will recommence. <br />All of tha above information shall be of sufficient detail and contain <br />sufficient information to ensure that the praposed structure will be <br />constructed in compliance with the City Building Code. <br />Sections shall be applicable to plan submitted. <br />Sincerely, <br />Jeff Heilman <br />Engineering Technician <br />JH:eh/52 <br />