My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4626 HARBOR LN 2018-01-02 MF Import
>
Address Records
>
HARBOR LN
>
4626
>
4626 HARBOR LN 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:43:18 PM
Creation date
2/20/2017 10:17:51 PM
Metadata
Fields
Template:
Address Document
Street Name
HARBOR LN
Street Number
4626
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT <br />NELSON Project: Fox Residence File No.: 8592B 13 <br />GEOTECIINICAL Client: Logan Fox Date: 4/3/2013 <br />ASSOCIATES, INC Location: 4626 Harbor Lane Report No: 01 <br />Everett. WA <br />1731 1135r" Avc. NE M-500 \\'rather: Sunny, 60' Page: 2 of 2 <br />Woodinville, WA98072 Purpose of <br />(425)486.1669 FAX481-2510 Visit: Construction Monitoring By:JPH <br />Fourteen Pin Pile placements were observed. The contractor informed us that during the installation of <br />],in Pile 1, an obstruction was hit and tilted the pile approximately 3' to 5' away from the garage. It's <br />our opinion that this angle will not affect the suitability of the pile. Piles 1 Ithrough 13 were driven to <br />the recommended depth of 10 feet. However, Piles 9 and 10 were driven to 9.5 and 9.7 feet, <br />respectively. It's our opinion that these piles are suitably driven. Pile 12 hit a solid obstruction causing <br />it to rotate in place. The contractor spoke with structural engineer and informed the contractor that the <br />pile could be moved six inches to the west, as shown on the Site Plan. <br />Conclusion <br />We have been providing monitoring services on a full-time basis for pin pile installation. Our findings <br />and conclusions are based on specific test locations, results, and construction activities observed while <br />on site. it is our opinion that the Pin Piles installed today are suitably driven and should provide <br />adequate support for the planned loads. <br />Attachment: Site Plan <br />Distribution: <br />Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.