Laserfiche WebLink
Proposal for Geotechnical Services <br />Anderson Landslide Repair <br />Everett, Washingtcn <br />NGA Proposal No. P91280 <br />August 21, 2009 <br />Page 2 <br />soil. We also observed large trees lying on the slope below the residence. It is our understanding that the <br />trees were cut down approximately three weeks prior to (lie slide. <br />INITIAL. OPINION & RECOMMENDATION <br />It is our initial opinion that the landslide is still fairly active and conditions could worsen if the slide is not <br />promptly repaired. It is very important to temporarily secure this site as soon as possible until a <br />nermancnt solution can be intplenientedUWe recommend that the water in the pool and Jacuzzi be <br />.emptied immediately, as any leakage of those elements could cause further damage to the slopN c also <br />recommend that the trees that are lying on the slope be cut into smaller pieces and be removed from the <br />sl�c. Care should be taken white removing the tress as to not cause further disturbance to the slop�*c <br />also recommend that all of the downspouts and footing drains for the residence be located and tightlined <br />into a temporary syst_ cm to prevent water from [lowing onto or over the slope(? - he temporary drainage <br />system should be routed to the bottom of the slo ne. Also, after our field work is completed by mid week <br />next week, at a minimut , the upper portion of the slope should be covered with plastic and the plastic <br />secured with sandbags to protect the expo<cd soil front the elements and further erosion. <br />For the permanent slope repairs, we propose to drill tour geotechnical borings using a portable (hill rig <br />and collect soil samples. Along with the mapping of the slope and our soil explorations, we will analyze <br />the over-all slope stability of the area. It is our initial opinion that a ,Adier-pile type wall system along <br />with erosion control, and drainage systems will be needed to permanently stabilize the slope. We will <br />work with a qualified structural engineer to complete the design. The stabilization of the slope below the <br />wall is also extremely important. We will provide specific recommendations for several site drainage, <br />erosion control, and vegetation management. A contractor specializing in re -vegetation of steep slopes as <br />well as a biologist will need to be consulted, We will work with these consultants in preparing a re - <br />vegetation plan that will provide a stable slope. <br />SCOPE. <br />We propose to provide temporary recommendations for stabilizing the slide, and also work with you and <br />other consultants to provide a permanent solution for the slide. Based on our understanding of site <br />conditions, the services to be provided by NGA are to: <br />Review available soil and geologic maps of the area. <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />