Laserfiche WebLink
Earl Bumpass <br />April 1, 1999 <br />Page 2 of 2 <br />Plan Check k62016 <br />8. Provide insulation battle at each raft" space. <br />and 12" vertically above loosetill insulation. <br />Baffle shall extend 6" vertically above baths <br />9. Show on plans how requirements for roof ventilation are met. <br />10. Provide U-valve of all windows and skylights in addition. <br />Prepare a response letter showing where each item in this correction letter is addressed on the plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />commence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that the <br />proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />J?Heilman <br />Development Technician <br />JH:jeUApril'991aers(p 1.2) <br />