Laserfiche WebLink
June 17, 1996 <br />Mr. Gordon Witcher <br />Ciry of Everett Public Works <br />3200 Cedar Street <br />Everett WA 98201 <br />Re: Intracorp-Seaway <br />Triad Job No. 96-021 <br />TRIAD ASSOCUITES <br />�,, , �:��,,,� ,, ., <br />�:��,� �,��,��,�. � � . <br />t ane sw,�:, �� i <br />�,,,�, ���,� ��� :.. . <br />� „�<��., ,�:,, �.. , <br />o ����1]C� �D <br />� � r, <br />� JUid � G i996 <br />_... _......_ ............................_. <br />Dear Gordon: CITY OF [V�RETT <br />[31 . Per t Count <br />We are writing to provide a summary of the status of the p�ins an� Stortn �rainage Report for the <br />above project. In accordance with Bill Dunlap's and my meeting with you, Jane Zimmertnan and <br />Alan Locke on May 30th at your oft'ice, we have prepared the attached plans (three sets, 22 <br />sheets, revision dated June 14, 1996) and Storm Drainage Report (two copies, dated June 14, <br />1996) for your final approval. We have also enclosed the set of plans that were redlined by <br />Wayne Wents for his reference. <br />The attached plans show the site plan revisions identified in our submittal on May 15 and <br />additional clarifications as follows: <br />• The easterly building has been shifted to the south along with associated pari:ing along the <br />east and south sides of the easterly building. In order to accommodate this shift a rockery <br />has been added along the south side of the easterly building and a detail has been provided <br />with geotechnical reference. <br />• The finished floor elevations for both buildings have been revised along with the <br />associated pavement section between them. <br />• The portion of the site to the east of the entry (Lot 4) has been graded as indicated and <br />will drain into the existing drainage facilities in Merrill Creek Parkway. This portion of the <br />site will be planted with the indicated vegetation and will not be developed any further at <br />this time. <br />• The roof drainage for the easterly half of the larger building has been revised to drain to <br />the east and then to the northerly detention area. As explained further below, this came as <br />a result of properly proportioning the impervious areas contributing to the two separate <br />detention facilities as a result of the revised building and pa'�icing areas. <br />• A Channelization Plan has been added to the plans (sheet 22) to show the required details <br />requested by Wa�; � Wents. <br />The attached Storm Drainage Report has been modified to address the site plan revisions <br />identified in our submittal of May 15, 1996 and additional clarifications as follows: <br />. . . . .. . � . .. , . � . . . ... � � � : Phonc . � .,.�. �.�: Toll Fice :. � ;,. _ : - �.. Faa � .. � ..;,. � <br />