My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6414 HARDESON RD 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
6414
>
6414 HARDESON RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 7:59:09 AM
Creation date
2/20/2017 10:54:08 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6414
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />lune 17, 1996 <br />Mr. Gordon Witcher <br />Ciry of Evaett Public Works <br />• The Repon was originally prcparod with the plans titled "Intrawest Seaway" (Triad <br />project # 94-045) and date� June 3, 1994; <br />• On June 14, 1994, this report was revised and the plans and report wero approved; <br />• Since June 14, 1994, the Owner has been waiting for the best tenant situation and has now <br />arranged for tenants to occupy the buildings as indicated on the attachod plans. The <br />attached Report (dated June 14, 19%) hss been revised as follows to incorporate the site <br />revisions listed above: <br />• The site revisions did not chmge the total impavious are on the sita The site <br />revisions did increase the total roof area and did decrease the tot�,n ���na rr, Since <br />the westerly wetland enhancement and detention facility was designed to receive roof <br />area drainage only and since we did not want to further impaci the westerly portion of <br />the site, we revised the roof drainege from the easterly portion of the large, westerly <br />building to be directed to the detention facility to the north. This offsetting portion <br />corresponds to the easterly half of the large, westedy building (1.0 acre); <br />• The conveyance system was updated to reflxt the above changes and then reviewed <br />to confirn► that the system meets the reyuirement for 0.5' minimum freeboard for the <br />25-year storm event and no overtopping for 100-year stortn event. <br />Therefore, the attached Report mats the original approval conditions and has been updated to <br />show the site plan changes. <br />Please call me at 821-8448 if you have any questions alwut this submittal. �� F� � �` <br />Sincerely, <br />TRIAD ASSOCIATES <br />� "-G/ <br />;' � ' <br />Don Hill, P.E. <br />Senior Engineer <br />DH/wp <br />Enclosures <br />pc: Intracorp <br />Atto: Darren Peugh <br />nf�f� � ,�^'� <br />c� e�j �� n' ���C, I Ci <br />�r <br />��d le �c� � d' ��J� <br />.FW y✓�f �� �� ? �n /�' <br />�� ��S F! a►d ' �. a <br />, � �J' m ;�°f `J ,��J �' �r"� <br />:c° �( �d/ r-�• <br />,,��� �t�a ��Q� ��� ,��.''` <br />a�' ������� d, �h / /�n �% , <br />�,L�� c�.,;,nr�e�r�„h�' � L.� <br />s � � . J� ,9� <br />� ���GS �' \������ (�) I <br />5y;� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.