Laserfiche WebLink
� <br />� (per City of Everett gading permit #96-178) when the excavation is complete. Similarly, <br />I the southern portion of the site is aiso being excavated and the cut slope along the south <br />property line will be removed as Associated Sand and Gravel continues excavation tc the <br />, south. The cut slope along the north property line will remain. <br />Soils are identi6cd by the Soil Survey of Snohomi h Coun as Tokul type `C' (pfease <br />see Soils Mcrp located in the Appendix of this report). The property is bordered by <br />existing cut (at 1.5:1) on the north and south property lines (pleasc sx the Existing <br />Caulitioirs Fxhibi� located in the Appendix). When the above described grading pertnit <br />work is complete the site will be graded to sl�pe from southeast to northwest at <br />approximately 3%. <br />' <br />Storm Drainage Xeport For Aing Extrusion - Page 2 <br />