Laserfiche WebLink
� Due to site topography, the conveyance system was divided into two segments. The <br />I Northem segment was sized to collect nmoff from the northern portion of Lot 1 and <br />convey it to the detention facility. The Southern segment was designed to collect runoff <br />I from the southern portion of Lot 1 and provides a stub to allow for future flows <br />associated with the development of Lot 2 located to the south of Lot 1. The rational <br />method of analysis was used to estimate the flows generated by the 10.68 acres of Iand <br />� associated with the future development of Lot 2, located to the south of Lot 1, using a <br />I runoff coefficient identical to that used for the analysis of Lot 1(assuming 78% <br />impervious). A summary of the HGL calculations for each segment is provided below. <br />NORTHERN SYSTEM - 25 YEAR EVENT <br />SOUTAERN SYSTEM - 25 YEAR EVENT <br />Srorm Drninnge Reporr For Aing fatrusion - Pnge 15 <br />' <br />