Laserfiche WebLink
EROSION CONTRfiL CALCULATIONS <br />The temporary erosion and sedimentation control plan was designed to reduce the <br />di.charge of sediment laden runoff from the site. The plan is comprised of temporary <br />measures such as a rock wnstruction entrance, filter fence, swales etc. <br />In general, runoff from Lot 1 will sheet flow across cleared ereas into temporary <br />interceptor swales and be conveyed to the proposed detention pond. Runoff from Lot 2 <br />will also sheet flow across cleared arees and into temporary interceptor swales and be <br />conveyed to one of the two sediment ponds located at the northcast and northwest comers <br />of Lot 2. The sediment ponds will then discharge into the proposed detention pond which <br />i� tum will discharge into an existing tightline conveyance system located in Hardeson <br />Road. <br />In accordance with City of Everett standards, the sediment ponds were designed to have a <br />design water sr face area large enough ro settle out the design particle (medium silt) at a <br />10-year inflow rate. A temporary erosion control hydrograph was generated for the ]0- <br />year, 24-hour design stonn event assuming the entire site hac been cleared and graded. A <br />summary of the calculations for a single sediment pond is included on the following page. <br />This calculated surface area / volume was divided by two to provide the surface area / <br />volume for each of the two sediment ponds since each pond serves approximately one-half <br />of Lot 2. <br />Srorm Drninage Report For King Erlrusion - Pnge 16 <br />� <br />