Laserfiche WebLink
^ <br />.� <br />exposed soils, washing truck wheels before they leave the sire, and installing and <br />maintaining gravel construction entrances. Construction vehicle track-out is also a <br />major dust source. Any evidence of track-out can trigger violations and fines from the <br />Department of Ecology or the Puget Suund Air Pollution Control Agency. <br />GENERAL INFORMATION <br />The Snohomish County PUD currently has sufficient capacity to provide elecvical <br />power to the proposed development. For information about the specific elxtrical <br />secvice requirements for this project, please call the District's Everett Office at 425- <br />258-A272. <br />The sa�le shown on the site plan submitted for SEPA review is not accurate. The scale <br />shown on the plans submitted for permits must be correct. <br />� <br />�� <br />13 <br />