My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6700 HARDESON RD BASE FILE 2018-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6700
>
BASE FILE
>
6700 HARDESON RD BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 8:19:28 AM
Creation date
2/20/2017 11:10:15 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6700
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFOItMATION FOR DEVELOPER: <br />The foilowing informTtion is providect for the developer's benefit. These are not SEPA <br />conditions. All requirements are preliminary in nature, and are based upon the preliminary <br />site plan and the ordinances in effect at time of submittal for SEPA rcview. The proposal <br />must comply with all ordinances in effect at the time a complete building permit <br />applfcation is tiled, including those not specifically set forth herein. (Exception: For <br />vesting under the Zoning Code, please refer to Section 44 0£ the Zoning Code). Contact the <br />Plannittg Departznent for information regarding appeals processes for the requirements listed in <br />this document. <br />APPLICABLE CONDITIONS FROM SW EVERETT MITIGATION DECISION <br />DOCUMENT <br />Transportation <br />1. Traffic Mitigation is $150,900.00 which must be paid prior to issuance of building <br />permits. (SEPA Transportation and Land and Shoreline Use Policies) <br />2. Transit routes/schedules and high a:cupancy vehicle information must be prominentiy <br />displayed for employees at on-site commute information centers and ncar associated <br />walkways. Preferential parking space locations for carpools and vanpools must be <br />provided on all sites. Buildirgs must inco�orate bicycle and pedestrian amenities <br />such as lockers, shower rooms, and bicycle stands. (SEPA Transportation and Land <br />and Shoreline Use Policies) <br />Earth/Geologically Hazardous Areas <br />3. Threshold: Sites designated as geologically hazardous areas may lx mociified if <br />approved by the Pianning Director based upon rcview of a geotechnical report that <br />shows the proposal meets the criteria of Section 37 of the Zoning Code. The report <br />must show that the modifications will not create a hazard to the subject property or <br />surrounding properties. <br />Based upon the Geotechnical Report by Earth Consultants, Inc., dated July 16, 1998, <br />the Planning Director issued a decision allowing paving to extend to the tce of the <br />slope. Ail buildings must be setback 25 feet from the tce of the slope. See the <br />attached REVI decision. <br />4. Grading/filling on-site shall not adversely affect adjoining sites. (SEPA Earth and <br />Water Policies) <br />5. Clearing limits shall be staked, tlagged, and/or fenced off prior to initiation of any <br />clearing or land alteration activities as approved by the Engineering and Public Services <br />Inspector. The clearing limit along the tce of the slope shall be fenced during <br />3 <br />�1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.