My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6700 HARDESON RD BASE FILE 2018-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6700
>
BASE FILE
>
6700 HARDESON RD BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 8:19:28 AM
Creation date
2/20/2017 11:10:15 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6700
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTHER EtEQUIREMENTS <br />A Public Works Permit is required for this project. Detailed drawings in accordance <br />with City Design and Construction Standards shall be submitted ro the Public Works <br />Department, showing site parking layout, landscaping, utilities, storm drainage, <br />temporary construction erosion control, and all required improvements in the public <br />right-of-way. Public Works Department approval of these drawings is required prior <br />to any permits being issued. All improvemenGs shall be completed, approved and <br />warranted before the Occupanc;y Permit is issued. <br />2. Parking must be per Ciry Zoning Code and Ciry Design and Conswctiun Standards for <br />Development. <br />3. Any grading/fill on this site shall be done so as to not impact the surrounding <br />properties. <br />4. This project must comply with the current City of Everett Building Code and Sprinkler <br />Ordinance. <br />5. Special charges for connection to the sewer and water systems in accordance with <br />Ordinance 1998-94 and subsequent revision are applicable. These charges are based on <br />projected water usage and can be substantial. Applicant is encouraged to obtain a copy <br />of the Ordinance and determine estimated charges prior to building permit application. <br />The actual charges shall be computed by the Public Works Department per the <br />ordinance in effect at the time and according to the information on the approved plans <br />at the time of huilding permit issuance. <br />6. Storm water source control BMP's are required in accordance with Ciry standards. <br />7. Lack of comment on the plans submitted with the application dces not constitute <br />approval of these plans. <br />8. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every <br />swcture. <br />9. City streets xre to be kept clear of dirt and debris at all times during construction. <br />Dust suppression and street cleaning must occur as directed by the Public Works <br />Inspecror. <br />10. On-site watermain will be staked within an easement to the City. The easement will be <br />submitted to the City prior to issuance of pern►its. <br />8 <br />�) I <br />
The URL can be used to link to this page
Your browser does not support the video tag.