My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6700 HARDESON RD BASE FILE 2018-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6700
>
BASE FILE
>
6700 HARDESON RD BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 8:19:28 AM
Creation date
2/20/2017 11:10:15 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6700
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ <br />����od�� <br />OGT 2 g 199g <br />October 28, 1998 <br />Mr. Gordon Witcher <br />City of Everett Public Works <br />3200 Cedaz Street <br />Everett WA 98201 <br />Re: Intracorp Seaway, Tract 2 <br />Triad Job No. 97-150 <br />Dear Gordon; <br />CITY OF EVFRET'f <br />Permlt Services <br />� <br />TRIAD ASSOCU►7FS <br />Proicct Mnna9en�cnt <br />Cr.J Enginecnng <br />i..�na s�,��w„�.i <br />; nr J u,o r�a��nmq <br />,,,,��;:��,���� �,�,.����:,�, <br />We have revised the Grading and Utility Plans in response to your redlined comments. Your <br />redlined comments were provided on the attached set of the plans (1 ] sheets, 9/3//98) and we <br />have responded to them as highlighted in green pen. The attached Grading and Utility Plans <br />(mylars, 11 sheets, 10/23/98) have been revised as follows: <br />Shect 2 <br />Per Alan Locke's comment, both construction entrances have been revised to start at the <br />west end of the respective existing bridge decks. 1T►e northerly construction entrance has <br />been shown to tum to the south to miss TESC Pond 2. The cotresponding detail on sheet <br />3 has revised been accordingly; <br />Sheet 5 <br />The rockery shown at the west end of Section B-B is necessary in order to provide access <br />around the west side of Building B. The rockery will be approximately 8' high and has <br />bcen shown to shuw its relationship with the existing slope. Additional detail for this <br />cross section and the cross sections on sheet 5 has been added to show the pavement <br />widths, flowline, minimum cross slopes, curbs, and relationship with adjacent <br />property/site constraints; <br />Shcet 6 <br />Per Wayne Went's comment, curb ramps and crosswalk suiping have been shown and <br />called out at the southeast comer of Building B and at the nonheast comer of Building C. <br />The crosswalk at the northeast comer of Building C has been shown to coincide with the <br />handicap stalls along the east face of Building C approximately 75' south of the northeast <br />corner. The handicap stalis, curb ramps and crosswalk are in this location to provide the <br />required maximum slope from the handicap stalls to the building entry, This alignment <br />rcc;uires a rockery with handrail for the sidewalk along the east side of the road and a <br />smal� wall with handrail for the portion of sidewalk from the handicap stalls to the <br />building entry. Details regazding the rockery are shown on sheet 4!grading plan) and <br />shcet :i (Section A-A). Details regarding the small wall are shown on sheet 4(grading <br />P�an)> <br />I ld t 4 1 i5ih Avenuc+ NE. KirlJantl. 15'ash�npiw 98034�69T7 <br />PhoM <25 821.8448 Toll FfN 800.4BB 0756 FL< 425 821 3J81 Inbrn�l wixv InatlassoC com <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.