Laserfiche WebLink
ability of the Applicant to mitigate such potential impacts have been <br />adequately addressed. (Findings 6, 7 8� 8) <br />7. The parking provided exceeds all off-street parking standards. The on- <br />site circulation will provide circulation in a safe, efficient manner. <br />(Findings 8 8 9) <br />8. The proposal is compatible with other developments in the area. It will <br />not impact other properties. (Finding 10) <br />9. The signs on-site will be regulated. (Finding 11) <br />10. Landscaping, buffering, and screening of buildings, parking, loading, and <br />storage areas will be provided in a manner consistent with City of Everett <br />standards. (Findings 12 & 13) <br />11. There will be no significant generation of nuisance irritants, including <br />noise, smoke, dust, odor, glare, visual blight, or other undesirable <br />impacts. (Finding 14) <br />12. The proposal is consistent with the 5.1, Heavy Industrial designation as <br />set forth in the Everett General Plan. The proposal is adjunct to such <br />land use. (Finding 17) <br />13. The proposal is consistent with the M-2, Heavy Manufacturing zoning <br />standards and ordinances within the City of Everett. (Finding 15) <br />14. Adequate measures have been taken by the Applicant to address public <br />transit and traffic reduction. (Findings 18 8 19) <br />15. The special evaluation criteria for the location of a govemmental office <br />outside the Central Business District have been reviewed. The proposai <br />will be compatible with the uses in the zone in which it will be tocated, <br />and it is not practical to locate the facility in downtown Everett. (Findings <br />18 & 19) <br />7 <br />