My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7100
>
7100 HARDESON RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 3:03:44 PM
Creation date
2/20/2017 11:30:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
594
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fisher 8 Sons, Inc. <br />August 19, 1997 <br />Augercast Concrete Piers <br />Augercast piers should be <br />piers should be installed <br />subsurface conditions. <br />JN 97282 <br />Page 4 <br />installed with continuous flight, hollow-stem auger equipment. The <br />by an experienced contractor who is familiar with the anticipated <br />An allowable compressive capaciry of 45 tons can be attained by installing a 16-inch-diameter, <br />augercast concrete pier at least 10 feet into dense native strata. For transient loading, such as <br />wind or seismic loads, the allowable pier capacity may be increased by one-third. We can provide <br />design criteria for diHerent pier diameters and embedment lengths, if greater capacities are <br />required. The minimum center-to-center pier spacing should be three times the pier diameter. <br />Based on our test boring infortnaGon, we estimate that pier lengths of about 25 to 30 feet would be <br />required to achieve adequate penetration into the bearing soil. <br />We estimate that the total settlement of singie piers installed as described above will be on the <br />order of one-half inch. Most of this settiement should occur during the construction phase as the <br />dead loads are applied. The remaining post-construction settlement would be reatized as the live- <br />loads are applied. We estimate that differential settlements over any portion of the structures <br />should be less than about one-quarter inch. <br />We recommend reinforcing each pier its entire length. This typically consists of a rebar cage <br />extending at least a portion of the pier's length, with a full-length center bar. Each pier can be <br />assumed to have a point of fixity at 10 feet below the ground surface for the computation of lateral <br />load resistance. The Ioose soil against the piers can be assumed to have a design passive eaRh <br />resistance of 350 pounds per cubic foot (pc� acting on lwo times the pier diameter. Passive earth <br />pressures on the grade beams will also provide some lateral resistance. If structural fill is placed <br />against the outside of the grade beams, the design passive earth pressure from the fili can be <br />assumed to be equal to that pressure exerted by an equivalent fluid with a density of 350 pcf. <br />Seismic Considerations <br />The site is located within Seismic Zone 3, as illustrated on Figure No. 16-2 of the 1994 Unifortn <br />Building Code (UBC). In accordance with Tabie 16-J of the 1994 UBC, the site soil profile is best <br />represented by Profile Type S2. The existing fill and native soils beneath the proposed building <br />are not subject to seismic liquefaction. <br />Slabs-on-Grade <br />The building floors may be constructed as slabs-on-grade atop one foot of structural fill or the <br />existing fill if the fill can be compacted the structurai fill requirements. The subgrade soii must be <br />in a firtn, non-yielding condition at the time of slab construction or underslab fill placement. Any <br />soft areas encountered should be excavated and replaced with seiect, imported, structural flll. <br />All slabs-on-grade should be underlain by a capillary break or drainage layer consisUng of a <br />minimum 4-inch thickness of coarse, free-draining, structural fill with a gradaGon similar to that <br />discussed later in Pertnanent Foundation and Retainina Walls. In areas where the passage of <br />OEOTECH CONSULTAN7'S, INC• <br />
The URL can be used to link to this page
Your browser does not support the video tag.