My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7100
>
7100 HARDESON RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 3:03:44 PM
Creation date
2/20/2017 11:30:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
594
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUrtLE'.1tENTAL AlPLICATION FOR SPECIAL PR6PERTY USES <br />NARRATIVE S'FATEMENT - GENERAL & SPECIFIC CR[TERIA <br />Community Transit (CT) is requating a Special Property Use (SP[n pertnit for construction of a <br />new Administration Building outside of the B-3 zone. CT would like to construct this fuiliry at <br />our exiuing Operations Base located at 7000 Hardeson Road. This would consolidate CT's <br />operations, maintenance, administration, and executive staff at one location. <br />M Administration Building (office ux) is an allowed use in the M-2 zone; the rcquirement for an <br />SPU is triggercd by the fact that CT is a quasi-governmental agency, not that an office huilding is <br />an unacceptable use. <br />A. GENERAL EVALUAT[ON CRITERIA <br />1. The need of the neighborhood, district, or City for a proposed �pecial property use. <br />The proposed use would be located on �he existing C1' operations base. Lucating <br />administrative employees on the same site as operations and maintenance will increase <br />efficiency and communication throughout the agency. Additionally, employees would be able <br />to walk between facilities, instead of driving. <br />2. The adequacy of streets, utilities and public services requircd to serve +� proposed uu. <br />The site has adequate access directly from Hardeson Road via three existing bridge crossings. <br />The faciliry, a.s an office building, would not have large demands on public utilities or services; <br />existing levels of service are more than sufficient to serve the building. <br />3. The impact of tnfTic genernted by the proposed use on the surrounding area, <br />pedatrian circulation and public safety; nnd the ability of the proponent to mitignte <br />such potential impacu. <br />The building would generate approximately 239 average daily trips (ADT's), with 47 p.m. <br />peak hour trips. PedestriaNpublic access and safety will be maintained at the site, including <br />locating the building close to Hardeson Road, landscaped walkways, and separation from bus <br />circulation. CT has completed a traffic impact study which indicates traffic mitigation of <br />approximately $10,000 be paid to the City. <br />d. The provi�ion of adequate off-street parking, on-site circulation, and site access. <br />The site has more than adequate area for otF street parking, access, and circulation. <br />Remaining areas (not used for parking, circulation, buildings or required landscaping) will <br />likely be landscaped and/or planted with grass <br />S. Compatibility of proposed structures and improvements with surrounding properties, <br />including the size, height, location, setback :�ud arrnngement of all proposed buildings <br />and fAcilities, eapecially aa they relnte to light :�nd shadow impacb on more sensitive <br />land usea and less intensive zona. <br />The building will be of concrete tilt-up construction, designed to match and blend with the <br />existing on-site buildings and other buildings in the area. Approximately 26,000 square feet <br />Communiq• Transit Adminisvauon Building EXHIII Pagc I <br />SPU Pertnit Evaluadon Cntcna � <br />p � OE?�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.