Laserfiche WebLink
; <br />I¢formation for the CeveloPer: <br />1. Deta.11ed draviage ia accordance with City Design aad Construction <br />Standarda shall be suhmitted to the Public Works Departmeut showing site <br />parking layout, landecaping, utilities aad storm drainage. Public Worke <br />Department approval of theea draringn is required prior to any peisits <br />baing isaund. all. improvementa shall be completed and approval <br />r+enanced bafore [he Occupancy Permit is isaued. <br />2. A fire hydrant is required wiehin 200 driving feet but noe closer chan <br />• 50 feac of every stnicture. <br />City straete are to be kept clear of dirt and debris at all times during <br />comtruction. Duet suppreeaion a� screet cleaning muec occur as <br />directed by thn Public 4lorlce Impnctor. <br />3. A ane year guarantee ia required on the public improve�nnts for aa <br />awunt nac leea than l0I of the coet of canatruction and ahall run for <br />one year froo the datn of final approv+sl/isauance of thn firs[ Occupamy <br />Perait for the project. <br />4. <br />5. <br />6. <br />9 tw year guarantee is required :o: private ratantion/detantion or <br />other drainage tzeatment/abatemenr facilitiea serving areas larger ehan <br />one acre. <br />On-eitn rrater maia will ba etaked withia an easmeat to Che City. Th� <br />easmeat will be suhmitted to thn City prior to iseuancn of pacnita. <br />As-builta of stors sewer, sanitary aewer, graes 11aed swalea, watlande <br />and wetar systema rrill be required to be auhmitted per City Design and <br />Comtruction Seandards and Specificatiom. <br />7. Ae stated in Iten 14c, tha completnd project vrill have a total of 240 <br />parking apacee for employnas and deliverq vam . Accotding to thn City <br />of Everett 2oning Code, thn facility wuld require onlq 191 psrking <br />apaces Csna calculatione). Everett Tranait would encouragn a reduction <br />in the nuuber of parking spacea. The impleaentation of a succeseful � <br />vould reduce the n�ber of parlciag apacea needed, potnatially leaviag <br />more land for plant azpansion. <br />Build <br />Office <br />Pmceaeing Plant <br />Truck Shop <br />TOTAL <br />a. <br />b. <br />Sq• Ft• <br />14,000 <br />91.000 <br />2,400 <br />parking Ratio <br />1/400 <br />1/600 <br />1/600 <br />Parlciag Re4uired <br />35 <br />152 <br />4 <br />191 <br />Aaseline Moaitoring Report (BMR) muat be received no later than 90 <br />days prior to discharge. <br />Pretreatment syatem muat be installed prior to diacharge. <br />-10- <br />