Laserfiche WebLink
9. <br />c. <br />d. <br />f. <br />8• <br />� <br />r�. <br />ComplSaace must be achieved within 90 days after startup. <br />?zocess flovs must be separated from sanitary, cooliag, or any <br />ocher ilov sources. <br />Sampling (for moat paramecers) musc be flar paced composite. <br />Vew ordinance will include a prohibitlon agaiast the dlschazge of <br />any hazardoua or dangeroua xatce. <br />.a 5 year pecait fee of 52,000 will be collected ou a manchly basis. <br />h. A high strength xaste surcharge will be asansaed for BOD, TSS over <br />250ag/L aad for FOG over L00 mg/1 far animsl/vegerable oil and <br />grease and over 50 mg/L for petroln�a. <br />i. :1a induscrial surcharge of 50.10/1000 gallona xill also be charged <br />for procesa Elaw. <br />Tha criteria Listed on pagn 6 of the Mezrill and Ring Creek Restoration <br />?laa, dated �farch 19, 1991, auat be applied to the reatoration of the <br />entire etretch of streem cantained on this aita. <br />10. Appraval of the preliminary site plan doee not guarantee final approval <br />of the location of ehe vegetaeed srralee. Al1 pavmeat runoff mwt ba <br />routed throu;h the svalea prior to discharge to the strees. Tha <br />eziating topography of the aita indicacat ttut substantial grading rould <br />be requirnd to gnvity flov all pave�ent nmoff to the sxales in their <br />currently proposed locaeion. <br />11. The lift station propnrty must be leased from the Clty before ie caa ba <br />wed for the acceas to tha site. <br />12. Plaas for aay such syatem muet be submitted to the Buildiag Department <br />for e�uination a� approval. Such plans must include plana for the <br />uadarground mains that vill supply the apriniclnr syatem. <br />13. above-groucd sprinkler pipiag muat be hqdrostaticslly tested as <br />eatabliahed ia ?iFPA Standard 13. Undarground plping muat by <br />hqdroseacically testnd and fluahed as eetabliahed in NFPA Standard 24 <br />for private fire maina. _111 such eeats muet bn witnessed by a Fira <br />Department Inapector. Call 59-8710 to maka an appointment for <br />inspection. <br />14. Contractora' materials and test certificates must be submittad to tha <br />Everett °ire Department prior to isauance of aay Certificate of <br />Occupancy. Call 259-8726 for more i¢formation. <br />15. Flre lanea must be provided ae required in Everntt Mu¢icipal Code <br />46.44. Fire laaee aust be identlfied by red curbs with white stencil <br />stating 'Yo Parking - Fire Lane'. Vertical signe stated 'No Parking - <br />Fire Lane - Tow Awaq Zone' to be locatad as approved bq the Fire Marshal. <br />-11- <br />0 <br />