My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7400 HARDESON RD 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
7400
>
7400 HARDESON RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 7:51:53 AM
Creation date
2/20/2017 11:41:48 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Some sites may have capacity in excess of the thresnold available to se�ve potential users. If a <br />proposal would exceed 1,700 gallons per gross acre pet day and/or 4,000 gallons per gtoss acre <br />per day of instantaneous peak flow, additional analysis will be required. Ttte additional analysis <br />may be as simple as calculations completed by the Public Works Department prior to a pt�e- <br />application meeting on a specific development proposal. The additional analysis must determine <br />how the proposal's sewer demand will affect the sewer system. P%ec.+s with no additional <br />major improvements needed and no advecse cumulative impacts ort the sewer system are covercd <br />by this analysis. Additional SEPA analysis will be tequired for projects that may require major <br />improvements not identified in the EIS or that may have adverse cumulative impacts on the <br />sewer system. <br />The EIS analysis does not cover the impacts of constn�ction of a new sewer main across Japanese <br />Gulch. Additional analysis is required to review altemative routes for the line which will <br />minimize the impacts of the proposal, or altemative means of providing sewers to that area. <br />8.7.3 Mitigatioa Measures <br />Individual developments may be responsible for funding all or a portion of sewer system <br />capital improvements as shown in Table S-2 (Table 3.8-4 in the EIS). (SEPA Public <br />Services and Utilities Policies) <br />Table 8-2 <br />Sewer System Capital Improvements Needed for the Portion of the <br />SW Everet Subarea Served by the Cily of Everett <br />Capital Improvement Cost Respons- Properties That May Esdmated <br />Needed Ibility for Be Required to Fund all Timing of <br />Funding or a Portion oi the Improv� <br />Improvement Ment <br />2,950 feet on $735,000 City and Merrill Creek Associates, Before <br />Hardeson Road Developer Associated Sand and 2020 <br />between Overall Gravel, Overall I,aundry <br />Laundry and Memll <br />Crcek Pkwy. <br />2,100 feet of Merrill $525,000 City and Merrill Creek Associates, Before <br />Creek Pazlcway Developer Associated Sand and 2020 <br />between Hardeson Gravel, and Overall <br />Road and Glenwood Laundry <br />y� <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.