Laserfiche WebLink
Somc sitcs may havc capacity in cxccss of thc threshold availablc to scrvc potcntial uscrs. If a proposal <br />�vould c�cced 1,700 gallons per gross acrc per day and/or d,000 gallons per gross acrc per day of <br />instanlancous pcak (lo�v, additional analysis will bc rcyuired. 'I'hc additional analysis may be as simplc as <br />calculntions completed by tlic Public ���orks Departmcnl prior to n pro-application mecting on a specific <br />devclopment proposal. 'I�hc additional analysis must detcrminc how the proposal's se�ver demand will affect <br />the se�ver system. Projecls with no additional major improvements nccded and no adverse cumulative <br />impacts on thc sc�ver systcm arc covcrcd by lhis analy�is. Addilional SLYA mialysis will be rcquired for <br />projects that may requirc major impro��cments not identiiicd in thc rIS or that may have ad��crse cwnulati��c <br />impacts on thc sewcr sysicm. <br />The I�IS analysis docs not covcr the impacts of construction of a new scwcr main across Japancse Gulch. <br />Additional analysis is rcquircd to rc��icw altcmati�•c routes for thc linc ��hich will minimizc thc impacts of <br />thc proposal, or altcrnati��c mcans of providing sc��crs to that arca. <br />8.7.3 Mitigution lbtcasures: Nonc <br />MITIGATION OF ADVLItSE ID1PACTS I3Y SEPA: <br />Prior lo issuance of any p�nnits, thc l�pplicant must pay a mitigation fce of 5114,5')0.00 per the <br />City's 7'raffic Ntitigation Ordinancc No. 2425-99. (SL'PA Transportation Policics) <br />2. 'fhc drivc���ay on Sicvcrs-Duccy [31�•d. must bc restrictcd to right-i��/right-out. <br />3. Storm water Jctention and/or treatment systcros rccci��ing nmoff from both public strects and privatc <br />property shall bc privatcl}' maintaincd, with hold-harnilcss agrccmcnls granlcd lo thc Cily for thc <br />"pttblic" runofG 'I�he numbcr of purcly puUlic systems (i.c.. those that reccive runoff only Gom <br />public rights-of-way) shall bc mimmized anJ, ���hcn crcatcd, shall Uc dcdicatcd to lhc city m scparatc <br />tracts of land. <br />�4. 'I'hc city rcquires regular maintcnancc of stonn watcr control facilitics, :md conducts an annual <br />inspcction program to dctcct maintcnancc dcficicncics. A single cnlity must bc ultimatcly <br />responsiblc to ensurc that each f,icilitp is maintained in accordance with City of E��crett standards. <br />Whcn the stonn water control facility is �vholly located upun a single lot, that entity shall be the <br />owncr of thc land. I�or all stonn �eater control facilitics sen�ing multiple lots, the city shall be <br />providecl �� ilh a singlc point of contact for the corrcction of maintenance delicicncies. <br />OTI1�R RGQUIRI's111EN7'S: <br />r1 Vublic �Vorhs Permit is requircd for this projecL Dctailed dra�vings in accordance with City <br />Dcsign and Constru�tion Standards shall be submilled to the Public Works Department, sho�ving sitc <br />parking layout, landscaping, utilitics, slorm dr:�in�gc, temporary construction crosion conlrol, and all <br />requircd improvcmcnls in thc public riglit-ol=way. Public V1'orks Dcpartment appro��al of thcsc <br />drawings is rcquircd prior to uny pcnnits bcing issucd. All improvcments shall bc completed and <br />approvcd warrantcd hclore thc Occupancy Pcmiit is issucd/final appro��al is grantcd. <br />l0 <br />