Laserfiche WebLink
2. I�ull standard half street improvements arc rcquired to Sicvcrs-Duccy l3oule��ard, including but not <br />limitcd to curb, guttcr, sidewalks, strcct widcning and drainagc control per City Dcsign Standards. <br />3. Parking musl Uc per Ciry %oning Codc and City Dcsign and Construction StandarJs for <br />Dceclopmcnt. <br />4. '1'his rroject must compl}� with the currcnt Cit}' of I:vcrett I3uilJing Code and Sprinkler Ordinance. <br />5. Special charges for connectiun to thc sewer and watcr systcros in accordance with Ordinance 1998-94 <br />and subsequcnt revision arc applicablc. ��hese char5cs are based on projected watcr usage and can be <br />substantial. Applicanl is encouragcd to obtain a copy of thc Ordinancc and Jeterminc estimated <br />chargcs prior to builJing pcnnit application. 'I'hc actual chargcs shall bc computcd by thc Public <br />Works Dep:�rtment per lhc ordinance in cffect al die timc and according to thc mfonn�tion on the <br />approvcd plans at thc timc of building pcnnit issuancc. <br />6. A firc hydrant is rcquircd within 200 driving fcct but not closcr than 50 fcct of c��ery structurc. <br />7. City strccts arc to bc kcpt cicar of dirt and dcbris at all timcs during construction. Dust suppression <br />and strcct cicaning must occur as dirccted by thc Public \Vorks Inspcctor. <br />8. A onc-ycar �varrvity is rcquired on the public improvcmcnt for an amount not Icss than 10% of thc <br />cost of construction and shall run lor one year from thc date of final appro��al/issuance of thc first <br />Occupanc�� Pcrmit. <br />9. On-sitc walcr main ���ill bc stakccl within an cascmcnt to thc City. 'l�hc cascmcnt will bc submittcd to <br />thc City prior to issuancc of pennits. <br />10. As-buills of storm sc�vcr, sanitary sewcr, and water systcros will be required to be submitted per City <br />ncsign and Construction Standards and Spccifications for Ucvclopmcnt. <br />I 1. Any brokcn or damagcd sidc���alk shall bc repaired/replaccd per the City Public Works Inspcctor. <br />12. Walkways must be pro��ided cach building to thc public sidewalk. <br />13. '1'hc pmposcd drivc�vays must mcct thc city driveway throat dcpth standards. <br />14. 7�rcatmcnt ofstorm watcr nmoff fiom pavcd arcas must occur, per city standards, prior to dischargc <br />of thc storm ���ater I�om indi��idual lots or to a strcam or �vcAand. Storm ���ater treatment is rcquired <br />�vhcn 5,000 squ�rc fect of pavement is crcated by a project. <br />15. On-sitc dctcntion is requircd per city standards. Dctcntion must bc calculated for 2"`� growth forest on <br />Aldcr�vood Till soils. <br />I G, '1'hc �4ountain View 13usiness Centcr site originall)' coniained portions of thrce separ�ite drainage <br />Uasins. 'fhe amount of arca ch•oining tu the creek in cach drainage basin after development and major <br />land alterations shall not be grcatcr than the amount of arca draining to cach crcek historically (before <br />mining occurred on thc site). In addition, thc natural dischargc locations should bc re-established to <br />thc maaimum cxtcnt possiUlc. <br />17. "I�hc current options for slonn water Ireatment are: <br />(a) an infiltration basin. <br />(b) a ���ctpond <br />(c) a constructcd wcUanJ <br />(d) a SMI S1onnFillcr <br />m <br />