Laserfiche WebLink
I. <br />4229 76' St NE. suite 204 <br />Maryswile. WA 96270 <br />Phone (360) 657-4709 BergEngineering <br />FAX (360)657-4779 <br />ebergw @veuon.net <br />May 8, 2007 0 �� - I cr� <br />Jane Zimmerman I 1 <br />CIry of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />Re: Drainage Report — Hardeson Rd Business Pk — Phase 1 — SEPA 06-067 <br />Site Address — 75'" St. SW @ Hardeson Rd. <br />For Hardeson Road, LLC — BE05018 <br />The 16.33-acre property is located in the southwest quadrant of the 751h St. SW/ <br />Hardeson Road Intersection in the City of Everett. <br />The property contains no significant impervious areas, and is covered with brush <br />and second growth trees. A drainage course (-6% gradient) conveys runoff from <br />8011' St SW and properties south and bisects the property collecting in a Category <br />II wetland located along the NE boundary of the property. Drainage then flows <br />into the City storm system (48") within Hardeson Rd. This City system Flows <br />northerly emptying into Merrill and Ring Creek, which in turn discharges into <br />Possession Sound. <br />Site soils are classified as: <br />5.6 — Alderwood — Urban land complex — (Type C Soil) <br />This submittal is Phase 1 of an ultimate business park development proposed for <br />the property. The scope of Phase 1 is to provide an alternate path for the subject <br />drainage course bisecting the property from south to north. This will be <br />accomplished by installing an 18" storm drain system near the east properly line <br />and will intercept drainage entering the property from the south (80"' St SW and <br />offsite properties contributing). <br />This system will divert some runoff (-1 cfs) from the estimated offsite Flow (12.11 <br />cfs) to a new grass channel that will be located near the previously mentioned <br />wetland. The remainder of this offsite flow will discharge into the natural <br />drainage course into the subject wetland by "bubbling up" and spreading out over <br />4%6" quarry spy )laced around CB2 performing an energy dissipater function. <br />A 2-cell wet -.-id is also provided to handle the ultimate stormwaler <br />requirements tu:.ne site. <br />