12/10/97 WED 1e:ee FAX /era eel e0ao G90 ENGINE®n wool <br />SOA Corporation <br />December 9. 1997 <br />Page 3 <br />FOUNDATIONS <br />Excavation for ldailding A footings began on May 9. 1997. Extensive overescavation was <br />required on the western perimeter will footing;. Footing trenches wom backAiled with btpocted <br />and on -site fin. Excavation for Building B footings began on June 18, 1997. Gvmv=vated <br />footing trenches were bacldL'led with on -site soils. Building C wan footing subgrades were <br />evaluated on June 18, 1997. <br />The footing wbgtades were evahstsd prior to placing cOOM A for footings. Footing <br />subgtade am which were soft or otherwise unwitabk were overexcaysted and replaced with <br />struannal fill. Repairs of these areas were completed satisfactorily. In our opinion, the footing <br />wbgtades were prepared in accordance with our mc4aenendation. <br />BLOCK WALLS <br />Construction of the block walls bsgtrtt on August 1e, 1997 sad September S, 1997 for the <br />wan located southwest of Building A and the wall aroUl d the Norm water detention pond. <br />respectively. Bactf111 material used on both wails consisted of snits arbaurd fill. Wall <br />sabpreds and drain comizvoticn were not observed on the wall fantod neat Building A. Also, <br />ow monitoring of construction of IM block walls did not include observation of the pbtosmant <br />of the geogrid rdnfbtcing for the block walls. Wall footing subgrades watered the detection pond <br />were evdu*W by probing. Footing ntbgndes which were soft or otherwin emwitable were <br />ovetexoevsW and replwW with sttudaW fill. In our opinion, the footing wbgrades and wall <br />bwldUs were prepared in swordama with the project apsoifioaiow. <br />UTILITIES <br />Placement and compsction of bwWM In utility trAWAN IN the In aswa srd emitary <br />sewer were Monitored on an intermiria t bash. U" ttarKhes; were boOffi1 en, with the 004ks <br />tnatertd excavated from the trenches. 1b our opinion, those portions of d a backfill which we <br />"Mew were compacted in atxardeaoe with our reeornmendatbns. <br />PAVEMENTS <br />Prepared pavement subgrde wess were evaluated on Ssptentba 23, 1997 by pcoohonirlg <br />with a loaded dump truck and by probing. In general, the subgradsi was In a doors more -yielding <br />condition; however, localised areas of soft subgreds wen idsmtified. <br />Wet weather conditions preceded flaal preparation of the pavement attbgtda. Several <br />localised area of soft subgrde had developed as a rosult of the wet comditkms and coamcdon <br />traAle. We did not have an opportudty to reevointe these areas prior to paving. T%ew sew <br />were paved over with the undmtaodtng tier; future maimtaana or repair may be regahW In <br />these area. <br />0 e 0 E n a{ Is t e r e Fee No. sew-01247d130 <br />