Laserfiche WebLink
8. List any environmental information yt <br />this proposal. <br />NONE <br />now about that has been prepared• or a x prepared• directly related to <br />S. Do yo" know whether applications are pending for governmental approvals of other proposals directly affecting the <br />property covered by your proposal? If yes, explain. p po <br />NO <br />10. List any government approvals or permits that will be needed for your proposal, if known. <br />Building Permit and as part of process, government approvals include clearing, grading <br />landscaping and utility work <br />11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. <br />There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not <br />need to repo ,t those answers on this page. <br />The site will have three major buildings located adjacent to the westerly property line. <br />They include a warehouse of 15,000 s.f., a warehouse of 20,160 s.f., and a two story office building of 4,000 s.f.. The structures are all steel construction on continuous-- <br />concrete <br />foundations. The main building contains a bottling assembly line for soft <br />drinks. <br />12. Location of the proposal. Give sufficient information for a person to understand the precise location of your pro. <br />Posed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur <br />over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, <br />and topographic map, if reasonably available. While you should submit ary plans required by the agency, you are not <br />required to duplicate maps or detailed plans submitted with any permit applications relat-d to this checklist. <br />Hardeson Road approximately 1000 feet west of its intersection with 80th St. <br />TO BE COMPLETED By APPLICANT <br />B. ENVIRONMENTAL ELEMENTS <br />I. Earth <br />EVALUATION FOR <br />AGENCY USE ONLY <br />a. General description of the site (circle one): Flat. rolling, <br />other I11Njt;tsteep slopes, mountainous, <br />b. What is the steepest slope on the site (approximate percent slope)? <br />14% <br />r <br />