Laserfiche WebLink
TO BE COMPLETE[) By APPLICANT <br />EVALUAnO,N FOR <br />c• What general t AGENCY USE ONLY <br />types of soils are found on the site (for example, clav, sand, <br />muck)? .you know the classification of agricultural soils, specify them and note an <br />farmland, gravel, peat, I <br />Alderwood—Urban Soil Classification Y Prime I <br />per 1983 Soil Survey of Snohomish County <br />d. Are there surface indications or history of unstable soils in the immediate vicinity! If so. <br />describe. <br />NO <br />e. Describe the Purpose, type, and approximate quantities of any filling or gndin pro. <br />Posed. Indicate source of fill. <br />Filling and gradingg <br />will be required to create a building pad. <br />Approximately . tely 18,000 C.Y. <br />pcut and fill will be required for this <br />f. Could erosion occur as a result of clearing, construction, or use'! If so, generally describe. <br />Yes, during clearing and grading and before final landscaping is <br />completed, stormwater runoff may cause erosion. After <br />construction, the potential for erosion will significantly diminish. <br />S. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildings)? <br />approximately 80x <br />h Proposed measures to reduce or Control erosion, or other impacts to the earth, if any: <br />A Temporary Erosion/Sedimentation Control Pl <br />to City of Everett Standards, an will be prepared <br />2. Air <br />a. What types of emissions to the air would result from the proposal (i.e.. dust, automobile. <br />Odors. industrial wood smoke) during construction and when the project is completed? If <br />any, generally describe and give approximate quantities if known. <br />During construction, diesel emissions will occur, and potentially, <br />dust if constructed in late summer; after construction, automobile <br />and truck traffic will have emissions. <br />b. Are there any off —site sources of emissions or odor that may affect your proposal? If so, <br />generally describe. <br />NO <br />C. Proposed measures to reduce or control emissions or other impacts to air, if any: <br />Conformance to City of Everett and Puget Sound Air Pollution <br />Control Standards. <br />