Laserfiche WebLink
TO BE COMPLETED BY APPLICANT <br />EVALUATION FOR <br />AGENCY USE ONLY <br />g. Proposed measures to reduce or control transportation impacts, if any: <br />NONE <br />15. Public Services <br />a. Would the project result in an increased need for public services (for example: fire pro. <br />tection, police protection, health care, schools, other)" If so, generally describe. <br />Yes, generally the same type of services normally required for uses <br />of the type proposed. <br />b. Proposed measures to reduce or control direct impacts on public services, if any. <br />NONE <br />16. Utilities <br />a. Circle utilities currently available at the site: eleamicity, natRso V=, waxer, refuses serv. <br />ice, tehp�np % mr�ypy se"L septic system, other. PUD <br />b. Describe the utilities that are proposed for the project, the utility providing the service, <br />and the general construction activities on the site or in the immediate vicinity which might <br />tiQ7edol'Everett for Water and Sewer <br />PUD N1 Of Snohomish County for Power <br />Washington Natural Gas <br />GTNW for telephone <br />Rubatino's for Refuse <br />C. SIGNATURE <br />The above answers are true and complete to the best of my knowledge. 1 understand that <br />the lead agency is relying on them to make its decision. <br />J <br />Signature: ....... J/� ...� ..I� ..� : 1J.. J............................ . <br />DateSubmitted: ................. .I ...................................... <br />