Laserfiche WebLink
P7"'L DECLARATION OF NON-SIGtiIFICANCE <br />16. Off street loading and unloading bertlu must be provided i� compliance with Section 19.40.070 <br />of the Zoning Code, and hours of loading and unloading activities shall be limited to 7:00 A. M. <br />to 6:00 P. M. if the more restrictive requirements of�the State and Local noise codes can not <br />be met. <br />17. A detailed drawing shall be submitted to the Public Works Department showing parking layout, <br />landscaping, driveways, utilities, storm drainage, an�' all required improvements to the public <br />righi-of-way. Public Works Department approval of these drawings is required before any <br />permits are issued. All improvements shall be completed before the Occupancy Permit is <br />issued. • . <br />As-builts, easement, and a one year Warrantee Bond in the amount of 1090 of the cost of <br />construction of the public water system are required within 10 working days of obtaining public <br />water connection. <br />18. During construction, City streets are to be kept clear of dirt and debris and all truck traffic to <br />and from the site within the City of Everett shall be on arterial streets unless otherwise <br />approved by the Public Works Department. <br />�.u_ . ' r! - <br />Sea-Prop Industrial Project <br />Lead Agency: <br />Contact Person: <br />Proponent <br />Sea-Prop <br />P.U. Box 587 <br />Edmonds, WA 98020 <br />City of Everett Planning Department <br />Bob Landles Phone: <br />Location of Proposal <br />North of 80th, west of Hardeson Rd. <br />259-8731 <br />This proposal has been deternined not to have a significant adverse impact on the environment. <br />An Environmental Imgact Statement is not required under RCW 43.21C.030(2)(c). This decision <br />was made after revie��� by the lead agency of a completed environmental chec}:list and other <br />infonnation on file �vith the lead aaency. This Declaration of Non-Signif.icance is specifically <br />conditioned on compliar.ce with the conditions attached hereto Mhich are inwrporated by referenc: <br />as if fully set forth herein. <br />A fifteen day review period has elapsed for this project and no adverse comment-s were reccived. <br />FesponsiUle Official: Dennis Derickson <br />Title: Planning Dir.ector <br />Date: <br />� � ' ����� � <br />Si9nature: ��/" �� . �-� � ' ���' <br />tiOTE: This final Declaration�of NemSignificance may be withdrawn in the event of �i9ni.ficant <br />cl�anges in this proposal, or failure to comply with the conditions upon �.hich tliis neclaration <br />oi Non-Signif.icancc is predicated. <br />J <br />