My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7720
>
BASE FILE
>
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 2:26:59 PM
Creation date
2/21/2017 12:26:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7720
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />fROM <br />DATE <br />Bob Landles, Planning D� <br />Public Works Department <br />July 30, 1980 <br />rtment <br />����l�bv <br />sue�ecr S.E.P.A. Checklist R view /i80/60 <br />PROPOSAL: <br />°��5���_.,�[�� <br />AUG -1 ?9°0 <br />CIT�� "i' � \/;= (�.( r��'j''7� <br />CITY OF E�6R�TT, EVEHETTWASIANGTON ..,__.._�. <br />�..,u,�..,, �.,;c. <br />onstruction of a 130 000 ft2 warehouse North of SOth St., and ��est of <br />Hardeson Road. <br />RECOMMENDATIONS: <br />It is the recommendation of the Public Works Department that issuance of a l�legative <br />Declaration be subject to the following: <br />1. A detailed drawing shall be submitted to the Public Works Department showing <br />parking layout, landscaping, driveways, utilities, storm drainage, and all required <br />improvements to the public right-of-way. Public Works Department approval <br />of these drawings is required before any permits are issued. All improvements <br />shall be completed before the Occupancy Permit is issued. <br />As-builts, easement, and a c^e year Warrantee Bond in the amount of 10% of <br />the cost of construction of the public water system are required within 10 working <br />days of obtaining public water connection. <br />2. City streets are to be kept clear of dirt and debris during construction. <br />3. <br />4. <br />5. <br />6. <br />7. <br />S. <br />During construction, all truck traffic to and from the site within the City of <br />Everett shall be on arterial streets unless otherwise approved by the Public Works <br />DepartmenL <br />Participation in the cost to fund the lift station and Sewer Interceptor in the <br />South Everett area is required. <br />On-site detention is required. A temporary erosion and sedimentation control <br />plan must be approved by the Public Norks Department before any clearing, <br />grading or other site preparation can begin. Drainage calculations to be submitted <br />on City Drainage Plan submission form. Reseeding of eaposed earth is required <br />wiiliin 30 days of completion of earth worl<. To minimize erosion, paving should <br />follow clearing and grading activities as quickly as possible. If this lag time <br />is greater than 30 days, the exposed soils miist be hydroseeded. <br />A grading plan is required,including elevations and .. �ss sections of internal <br />traffic circulation, stripping requirements and method of compaction of fill <br />material. The plan shall also sho�v rework of natural drainage channels. <br />A preconstruction conference on Civil [ngineering portion of project is required <br />prior to approval of Public Works PermiL The applicant shall arrange meeting <br />involving applicant, job superintendent, contractor, all subcontractors, Fire <br />Publ caWorl<s�Coord'nator,nPubllc \�rorkstlnspe�ctor,nand C ty Traff c Enginae r, <br />Plans for proposed eacavation disposal area must be reviewed by this department, <br />and possibly ilie S.[.P.A. process. <br />� , _ ._.. .__.. � <br />� <br />� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.