Laserfiche WebLink
I:VP1t7.TT WATI:R llrPARTA4EN'� <br />32U0 CEDAR STR��'P ' <br />rV�R�TT, WASHI�GTON <br />' 1360 <br />.. .. . . . ....................... _ <br />` :� �iEr',E' 1 <br />COST �STIMAT� SHT�]3T PuY.? . 1'iorl;s b•n` <br />TYPL OF I?�ISTALLATION : 8" hot tap and connection including 15' of <br />8" pipe installed • <br />LOCATION • Hardeson Road between 75th and 76th <br />RLQUEST�D BY <br />DATE OF R�C�UEST <br />SIZ� <br />�STIMAT�D COST <br />Lonnie, En9ineerinc� <br />9-"1-80 <br />16" x 8" <br />$3,589.61 <br />(�Vhenever the estimated cost is not sufficient to cover the total <br />expense for laUor, materials, equipment rental and administration, <br />the deficit shall be charged to the property for which such installa- <br />tion was made and the owner thereoP, and providpp yrt�hei, that any <br />excess payment shall be returned to thc per ,on a 1 in for the in- <br />stallation.) <br />ESTII-iATFD COST ITrMI'L�ll !1S POLI.O�VS: <br />Labor $ 914.66 <br />1951.12 <br />Material 283.00 <br />Equipment Rental � 440.83 <br />Administration and supervision <br />Total estimated cost of project /� $3589.61 <br />.i�- , �n. n,� <br />Don lJeitkamp, Supervisor III - Water <br />cc: Bob Sparlin <br />Larry Callahan <br />Bud Krom <br />Don Wahl <br />Note: Scheduling prior to paving. Could be several weeks delay after <br />deposit is made depending on availability of 16"x8" tapping sleeve. <br />� <br />