Laserfiche WebLink
�V�RETT WATER DEPARTb7ENT <br />3200 CEDAR STIi.�LT <br />�VTRP:TT, VJAS1iINGTON <br />COST �STIMATE SHE7%T <br />TI'P� OF INSTALI.ATION : <br />LOCATION <br />REQU�STED BY <br />DATE OF REC,I,UEST <br />SIZL <br />ESTIIRAT�D COST <br />Fire Service <br />Hardeson & 80th Sea Properties Industrial Park <br />Tom Thetford <br />, 7-21-80 <br />$�� <br />. $8,703.92 <br />(Whenever the estimated cost is not sufficient to cover the total <br />expense for laUor, inaterials, equipment rei�tal and administration, <br />the d�ficit sliall be charged to the property for which such installa- <br />tion was made and the owner thereof, and provided further, that any <br />excess payment shall be returned to the person applying for tlie in- <br />stallation.) <br />�S7'II�iATEll COST ITL;tiII7ED AS rOLLOWS: <br />Labor <br />Material <br />Equipment Rental � <br />Street Restoration <br />Administration & Supervision <br />$2,291.23 <br />4,402.11 <br />821.68 <br />120.00 <br />1,068.90 <br />Total estimated cost of project $8,703.92 <br />� C-�.k� <br />0. D.Wa , S pervisor III, ater <br />CC: Bud Krom <br />D. Weitkamp <br />L. Callahan <br />B. Sparlin <br />� <br />� <br />