Laserfiche WebLink
9. Soils engineer's reports. <br />10. Reduction in concrete panel thickness from 6" to 5�" <br />Nhen we have received, reviewed and approved documents resolving <br />the above issues, we will remove the "Stop Work Order". <br />Sincerely, <br />� <br />1.�..,,_,.���- � �vJ� �� �-'�-- <br />Kenneth Callahan <br />Building Director <br />KC:bt <br />cc: Ballinger, Smith & Carson, Consulting Engineers <br />Doug Budden, Chief Inspector <br />Wally Christopherson, Ruilding Inspector <br />� <br />� <br />�' <br />