Laserfiche WebLink
Hong Conaultin6 En;ineeia <br />• Geotechnic�l Engineering • Material Tesdng • Constnxtion Qwliry Control Inspecdon • <br />August 22, ?981 <br />Neil Eshleman <br />Building Co., Inc. <br />P.O. Box 578 <br />Edmonds, Washington 98020 <br />Attention: Nr. Neil Eshleman <br />Subject: SeaProp Corporation Warehouse <br />Everett, Washington <br />Dear Sir: <br />As you aware, it is not a customary inspection practice to report <br />mistakes made by the Contractor• if these mistakes are corrected <br />without any lastir�y detriment to the proejct. In the present <br />instance, however, the visible omission of requirec resteel in <br />previous pours and current mistakes in resteel placement which I <br />have had to correct at a stage of construction when the ironwork <br />involved should have become routine, make me apprehensive that <br />similarly substandard construction, now covered up, could have been <br />characterized previous operations. This letter wiil address some <br />immediate concerns. Ne feet it requires adequate study by the building <br />owner's representative to clarify our concerns. <br />CONCRETE REINfORCEt•1ENT <br />On the two occasio�s that I have checked resteel on this praject <br />I have found major discrepancies in the tilt-up panel reinforcement <br />although a number of similar panels had previously been poured. The <br />17809 65th PI. W., lynrnvood, WA 99036 •(206) 743•4774 <br />� <br />