Laserfiche WebLink
o aIlIl �� o Q� <br />��fl�� �� <br />�a����� <br />September 11, 1981 <br />City of Everett <br />Building Department <br />City Hall <br />Gverett, Washington 98201 <br />Attention: Mr. Kenneth W. Callahan <br />Building Director <br />Subject: Seaprop Industrial Project <br />7720 Hardeson Road <br />Iiverett, Washington <br />Dear PSr. Callahan: <br />At our meeting at the job site, you expressed reservations about continved <br />roof construction bearing on the ti1C-up wall panels on grid 7. The concrete <br />closure pilasters between the panels have not yet been cast. As stated in <br />our phone conversation today, we see no reason tor waiting until the closures <br />are poured to proceed with roof construction. In fact, roof construction is <br />desirable since the roof will provide bracing for the tops of the wall panels. <br />The additional loads on these panels are very light compared to the weight of <br />the panels themselves. The base of the 5-1/2" section of the panels is <br />adequately laterally supported by the 10" retaining wall section below and <br />its pilasters and tie hacks. <br />If you have LurCl�er quesCions or comments, please Leel Lree tu conl'act us. <br />Sincerely, <br />BALLINGER, SffITH & CARSON <br />/ C�� /\ T <br />�� �'�'•�il�� < ( v'\-3LCl.%""� <br />Theodore G. Smith <br />TES:kjf <br />������(�D <br />SEP 151981 <br />CI7Y OF EVEREf_Ti <br />Inspection Dep� <br />� 90� Terminal Sales Building • Seattle, Washington 98101 • Tel. (206) 622-9296 <br />� <br />_J <br />