My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7720
>
BASE FILE
>
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 2:26:59 PM
Creation date
2/21/2017 12:26:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7720
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL Ii�SPECTIOt�S <br />CITY OF EVERE7T BUILDING DEPARTMENT <br />DATE:_ Senter�ber ]4. 1981 <br />T0: Pacific Testinq Laboratories <br />3220 - 17th Avenue 1•Jest <br />Seattle kA 98119 <br />PROJECT:_ SeaProp Corporation Warehouse <br />ARCHITECT: P..I.A. Corporation <br />ENGINEER: Ballinger, Sr�ith & Carson <br />OWNER: SeaProp Corporation <br />CONTRACTOR: Neil Eshelman <br />N�r. e�c,y,c,v� <br />CITY OF <br />everett <br />QTYHAIL • I5YB7�5 <br />EVERER, WASHINOTON <br />48201 <br />INSGECTION OEPAPTMENT <br />41e have been notified by the -Ar-c-ha-t�_'_; ��--�--�—r;���_r/Owner that you have been <br />authorized to act as Special Inspector for the referenced project in <br />accordance with the provisions of the Uniform Building Code, permit docu- <br />ments and special inspection requirements. Failure to comply with the <br />above requirements may be cause for revocation of this authority. <br />The following designated items require special inspections in compliance <br />with Section 306(a) of the Uniform Building Code. <br />� 1. CONCRETE: Ouring the taking of test specimens and placing of <br />all reinfurced concrete and pneumatically placed concrete. <br />� 2. DUCTILE t?OP'.EPlT-RESISTING CONCRETE FRAP'E: Continuous inspection <br />of the placement of the reinforcement and corcrete. <br />XX 3. REINFORCING STEEL AND PRESTRESSING STEEL: <br />A. Durine al stressing and grouting of prestressed concrete. <br />B. During placing of reinforcing steel, placing of tendons <br />and prestressing steel for all concrete required to have <br />special inspection by Item P�o. 1, <br />XX 4. WELDING: <br />A. Ductile mome,:t-resisting steel frames as required by <br />Section 2722(f.) of the Uniform Duilding Code. <br />B. Al1 structural welding, including �veldino of reinforcing <br />steel. <br />^Y 5. NIGH STREtJGTH BOLTING: During all bolt installations and tigh- <br />tenina operations. <br />�� <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.