Laserfiche WebLink
� <br />r Plan �heck No. 11�1 <br />I:en Callahan, Building Official <br />October 1, 1981 <br />Pa9e Two <br />� <br />Also, since the panels span to isolated footin9s, deep beam action should <br />be taken into account. 7his may require the t��+o "5 bars at the bottom <br />of the pe.nels �•+hich were apparently left out. <br />2, The closure join111eb�11sednforeexpansioo �nodreinfor'cenentrshouldspass <br />or for continuity. �ara11e1 to the o-iall by the use <br />through unless arranned to allo� moveineasel or �•n'ePP���g do not allow move- <br />of a sleeve or si;�ilar device ( a�, 9� uires <br />r�ent). If these walls are not shear �•ialls, Section 231e�h11tended for <br />structural separation firom the oCher ��ialls. If they �ovide con- <br />continuity, the joints are subject to the sa!�e shrinkage and temperature <br />forces as is the i�est of the eiall (Section 2614(e)) and must p' <br />asnshown,�allrofsthe iiorizontal reinforcement�must o�erlap Pufficientlyned <br />to transfer the stresses or all must be �•�elded together properly. <br />�ecial inspector from Hong Consulting <br />3, lJith respect to the ��+elding, the s{ <br />Eng�neers is co�'�"�ualifiedsengineer�for�theheeldiag sho ldrhave beenrs. <br />"procedure" by a q <br />established prior to welding and certified e:elders should have been used. ' <br />Chapter 26-5, U[iC SCandards. <br />Since the welding has already been accor.iplished, I�vould sug9est that you <br />require a qualified en9ineer (ldAQO has a list of them) to inspect ��hrocedure" <br />has been done, to review the inspector reports and to establish a P <br />to correct or to redo the �aork. <br />„ is provided by purlin struts <br />4. The engineer in his letter of 8/12/81 asserts that chord reinforcemen <br />is unimportant because the Level 1 building <br />back to the retaining �•iall system on grid 7•�� If by that he means the <br />ledger is transferrin9 chord forces, he should justify it for continuity <br />ifdnotteelded coraectlye should beArepaired,co�rotheremethod� f resisting� <br />chord forces proposed. <br />5. The justification for use of do�•iels embedded 4" into the panels around <br />eihich epoxy grout is used to replace the missed do�vels centers around the <br />use of a document by L. D. Noble, which tesieaceld,andequal�ifiedrtohdontheear <br />plants. Assuming that this person is exp ustif i��hat will be done <br />testin9, I have some reservations on its use to J y aced much <br />on this job. 'AyP-2 concrete �•�as used in the tests -��ihat composition and <br />stren9th did it have? The 9rooves on the reinforcing bars sp <br />farther apart that the t1�outdandnrods correctly> especially��'n�as�10P110 tal <br />be needed to place the g' � <br />fiole. <br />L � _. <br />