My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7720
>
BASE FILE
>
7720 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 2:26:59 PM
Creation date
2/21/2017 12:26:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7720
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />r Plan �heck No. 11�1 <br />I:en Callahan, Building Official <br />October 1, 1981 <br />Pa9e Two <br />� <br />Also, since the panels span to isolated footin9s, deep beam action should <br />be taken into account. 7his may require the t��+o "5 bars at the bottom <br />of the pe.nels �•+hich were apparently left out. <br />2, The closure join111eb�11sednforeexpansioo �nodreinfor'cenentrshouldspass <br />or for continuity. �ara11e1 to the o-iall by the use <br />through unless arranned to allo� moveineasel or �•n'ePP���g do not allow move- <br />of a sleeve or si;�ilar device ( a�, 9� uires <br />r�ent). If these walls are not shear �•ialls, Section 231e�h11tended for <br />structural separation firom the oCher ��ialls. If they �ovide con- <br />continuity, the joints are subject to the sa!�e shrinkage and temperature <br />forces as is the i�est of the eiall (Section 2614(e)) and must p' <br />asnshown,�allrofsthe iiorizontal reinforcement�must o�erlap Pufficientlyned <br />to transfer the stresses or all must be �•�elded together properly. <br />�ecial inspector from Hong Consulting <br />3, lJith respect to the ��+elding, the s{ <br />Eng�neers is co�'�"�ualifiedsengineer�for�theheeldiag sho ldrhave beenrs. <br />"procedure" by a q <br />established prior to welding and certified e:elders should have been used. ' <br />Chapter 26-5, U[iC SCandards. <br />Since the welding has already been accor.iplished, I�vould sug9est that you <br />require a qualified en9ineer (ldAQO has a list of them) to inspect ��hrocedure" <br />has been done, to review the inspector reports and to establish a P <br />to correct or to redo the �aork. <br />„ is provided by purlin struts <br />4. The engineer in his letter of 8/12/81 asserts that chord reinforcemen <br />is unimportant because the Level 1 building <br />back to the retaining �•iall system on grid 7•�� If by that he means the <br />ledger is transferrin9 chord forces, he should justify it for continuity <br />ifdnotteelded coraectlye should beArepaired,co�rotheremethod� f resisting� <br />chord forces proposed. <br />5. The justification for use of do�•iels embedded 4" into the panels around <br />eihich epoxy grout is used to replace the missed do�vels centers around the <br />use of a document by L. D. Noble, which tesieaceld,andequal�ifiedrtohdontheear <br />plants. Assuming that this person is exp ustif i��hat will be done <br />testin9, I have some reservations on its use to J y aced much <br />on this job. 'AyP-2 concrete �•�as used in the tests -��ihat composition and <br />stren9th did it have? The 9rooves on the reinforcing bars sp <br />farther apart that the t1�outdandnrods correctly> especially��'n�as�10P110 tal <br />be needed to place the g' � <br />fiole. <br />L � _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.