Laserfiche WebLink
ro � H <br />Y H N <br />K � n <br />omo <br />m�b <br />N I-i <br />� H � <br />.�,�� <br />H� <br />��� <br />S N <br />f7 O N <br />� �y �n <br />O N <br />COMFLlANCE ,l NWEC LO�'�ISE RESIDENTIAL CON� �� IANCE CHECKLIST <br />RE�UIRED • � <br />�;, . Electrlcally heated dwellings, s 3 stories, Zone 1, Western Washington � <br />iNspecnoN IMPORTANT: Please su I a „-.^6. �V ,. , � �� � <br />APPROVED pp y pproprlate Informatlon In the shaded boxes <br />below. Disregard topics that don't describe your bullding or equlpment. p�Q. <br />MOT place checks In the two left columns. <br />FRAM/NG PHASE (contlnued): <br />w <br />� <br />� <br />� Glazing etflciency required under the selected option will be: <br />❑s U.40 (Ch 716, options I,II) ❑s U.50 (Ch N6, Option III) <br />❑s U.60 (Ch JI6, Option IV) �s U._(Ch p4, 5, or 7, Option V) <br />�,_ <br />❑ Glazinp U-values verlfled through labels, manufacturer name and model numbers, or other <br />acceotabie documentation. <br />❑ Glazing alr leakape measues are met: <br />1) fixed site built: sto�s wilh sealant. <br />2) operating site built: weathersiripped with closer <br />❑ Concealed Insulation Is placed: 1) Behind shower/tub 2) Beh(nd partition studs <br />❑ Standard alr leakape cauiking is complete and installed in ihe following locations: <br />1) between Sole plate/subfloors 4) partition stud penetrations <br />2) wiring/piumbing/duct register penetrations 5) light lixture/ flue penetrations <br />3) rim joists/mud sills (heated lower floors) 6) around window and door frames <br />� Wirinp caulking materlais are appro��ed for contact with plastic wiring insutation. <br />� Advanced alr leakage airwrap is properly installed (See NWEC Section 502.4.4) <br />❑ Exhaus�v�entllatlon wlll be provlded for each dwelling unit as follows: �� V rv� <br />, .. ,: <, .,,:. ;. ; , <br />\ ..,, �,,.� ,..,...� -� < ,. : ,., « ., �,; .n � <br />� Locatlon Mlnimum allowed Fan CFM •Sones OK ? Min. d�uct dla. <br />; Whole house fan CFM�a.,ea,m.,oc�ui Yes � <br />: Bathroom fan(_� 50 C � 2 3.5" 7 Yes <br />'t Bathroom lan Yes � 2 3.5" ? Yes � <br />1—.,) 50 CFM <br />' Balhroom lan(_) 50 CFM \ Yes � Z 3'S� ? Yes C <br />� Yes ❑ 2 3.5" 7 Yes � <br />Kilchen lan 700 CFM <br />� Yes ❑ 2 5" ? Yes [] <br />OR Totalled CFM � Yes � 2 <br />sone (noise) ratmg tor fans located next to ihe room is s�2`5. No requirement tor remote <br />..� M;..'�,--� <br />�., <br />.,�. �,.:;;� � �.,;�� ,;�<. <br />❑ �] MechanJcal ventliatlon tan ducting has minimal bends and terminates outside ol building. <br />❑ ❑` Fresh alr wlll be provlded lor each dwelling unitas fotlows; � <br />,��10 CFM ea. bedroom through wali port(s) to ihe exterior w/ continuous flow capability) <br />10 CFM overatl Iiving area through a wall port to the exterior w/ continuous Ilow capability) <br />sOR❑ Central lorce� air lurnace which delivers outsido makeup a;. Ihrough the ducling system. <br />. �—.e,. <br />❑ ❑ Passlve Solar reqWrements (Chq6, Option III, Passive Sclar) under Sectioo 602.8 ar�T.e.me�,'_�— <br />NWEC Framing phase requlrements: <br />Approved by <br />Da te <br />WEE9 APPIL YO <br />Page 5 of 7 <br />