Laserfiche WebLink
� " <br />� '� <br />b C <br />Y N N <br />. <br />y n <br />oao <br />�q M '{1 <br />N M <br />� H � <br />O N <br />�ro� <br />H � <br />� H <br />M <br />N <br />O N <br />��y�n <br />O N <br />coMauaNce ':I,� NWEC LO�rRISE RE.�iIDENTIAL COMrLIANCE CHECKLIST <br />flEDU1RED <br />�; Electrically heated dwellings, s 3 stories, Zone 1, Western Washfngto <br />.,as a,, ., r�=,:S: . <br />INSPECTION .. , -.�.: •- - •r'. _,. , ;.:. : ;: , . .. <br />APPflOVED IMPORTANT: Piease supply In(ormaUon requested in the approptiate <br />shaded boxes below. Disregard boxes that don't describe your building or <br />equipment. D9�QSplace checks In the two left coiumns. <br />INSULAT/ON PHASE <br />❑' Walls(including rim joisis) wiil be insulated without compression to: Adt� <br />❑ fi•19 batl (ChN6, options I,III,IV) ❑ R-24 (Ch il6,Option II) �3`I R-�(Ch tl 4 or 5) <br />❑ ❑, Below grade walis not insulated on the exterior (See FOUNDATION PHASE) will be insulated to: <br />❑ R-19(Chapter 6, all Options) on lhe interior ❑ R-_ (Chapters 4, 5, or 7) on the interior. <br />❑ ❑ Vaulted cellings will be insu�ated without compression to: <br />� ❑ R38(Ch p6, all opticns) ❑ R_(Ch #4 or 5) <br />. s- ,. .:r ....:. ..•: ,� , :... . ,..,. :,.: . ...... . . ...... ,:. , , ,.,..: <br />❑ ❑ Skyllght wall Insulailon is installed and equivalent to the required wall R-vaiues <br />(Recommendation: place ceiling insulation batts in place behind skylight wells) <br />❑' Vapor retarders will be installed toward ihe warm suAace as represented below: <br />Select one o tion (or tloors, walls, and appropriate ceilings: <br />Floors: � Plywood labeled EXPOSURE 1❑ Poly (z 4 Mil) ❑ backed La;ts ❑ PVA <br />Walls: ❑ Poly plastic (� 4 Mil) ❑ backed batts ❑ PVA <br />Ceilings: ❑ Not required where ventilation space averages >12" above irsulalion. <br />� ❑Poly plastic ( 4 Miq ❑ backed batts �] PVA <br />❑; Heatlnp system efficlency and sizing requiremeMs will be met as represented below: <br />' Maximum heating syslem capacity (150%of design heat load) has heen calculated at �-•S KW <br />' Heat Pump efficlency will be met underthe foilowing compliance path: <br />❑ Ch 1t6, Option IV: air source heat pump: HSPF z 6.8 <br />❑ Ch NS air source heat pump: HSPF 2 E.B, COP z 2.7/2.0 <br />❑ Ch �5 waler source heat pump: COP� 3.0 <br />I Heating system requiremeMs �vlll Is net wlth foilowing system: <br />M f r._ <br />Type_ <br />del p Max. output KW <br />HSPF COP_ <br />NWEC Insulatlon phase requlrements: <br />Ppproved by: <br />Date <br />WEES �PPIL GO <br />Page 6 of 7 <br />