Laserfiche WebLink
REPAIR SP�IPICATIQNS AND LIST OP W0• TO BE BID <br />page 3 of 4 <br />Address; 2505 Harrison <br />3. Plumbin Replace all house galvanized water lines <br />(inc u ing outdoor faucet at northwest corner) with type <br />"M" cnpper lines sized to code. Re-install pipe <br />insulation and add as needed to complete insulatinq all <br />water lines. Install frost-free bibbs (2), one on the <br />front wall of house and the other at the rear. <br />Reinstall the hot water tank following installation of <br />concrete pad, addinq pressure relief line to house <br />exterior. <br />Remone bathtub and shower controls set and install new <br />faucet and shower set complete with arm coming out of <br />wall at standard height (lower than existing). Replace <br />tub onerflow chrome cover with new wider chrome cover <br />rrhich has openinq at bottom only. Check tub waste lines <br />and make sure they ate in proper working ocder, <br />repairinq as necessary. <br />All new faucets shall be washerless, Delta or equal. <br />Inatall level• :ype controls. All new plumbing work <br />shall be performed in compliance with the requirements <br />of the Oniform Plumbing Code, 1982 edition. <br />S 650- <br />4. Electrical Install a standard porch light on the <br />north wall of the back porch deck just above the top of <br />the screen door and plac�. on a wall switch near oven and - <br />back door. Install another wall switch at the same <br />location for florescent light in the garage. Run� new <br />overhead wiring between the house and the qarage and <br />wire into liqht. Add new duplex ceceptacle on qaraqe <br />north wall in handy location for owner and wire in <br />complete. Inatall new outdoor duplex receptaclea (2) at <br />the lront and back of house, installing at convenient <br />spot for owner's use. <br />All new wiring shall be performed in compliance with the <br />requirements of the National Electrical Code, 1981 <br />edition. <br />S 360 - <br />5. Floocin Tub Surround s Ritchen Laminate Floorinq. <br />Inatall 1 2 under ay na nq own over the entire <br />kitchen (under all appliances) and bathroom floora <br />(ply�rood underlay in bath). Glue down 312 per square <br />yard vinyl (retail price of vinyl only) to both kitchen <br />and bathroom complete with base and metal moldinga as <br />necessary to finish off job. New vinyl in kitchen out <br />to edge of existing carpet in dining room. Owner to <br />select vinyl. <br />Tub suzround. Glue a laminate (formica or equal) <br />surround to all three walls around the tub and up to the <br />top of the window complete with trim moldings and <br />silicone rubber caulking at joints. Install 9YPsum <br />water-resistant board at the �ub head (and other walls <br />if necessary) in preparation for laminate installation. <br />Note plumbing work will take place in this area. Owner <br />to select laminate color. <br />