Laserfiche WebLink
Washington State Department of Transportation Page 6 Six Year Transportation Improvement Program <br /> Agency Everett From 2003 to 2008 <br /> County No. 31 Hearing Date 6/26/02 <br /> City No. 420 Adoption Date 6/26/02 <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> ' A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. i I Federal Funding Local Agency <br /> C. Project TitleI ; 1 R/W <br /> I D. Street/County Road Name or Number Improve-I ! Phase Federal:Federal State 4th I Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project(Start Fund Cost by 1 FundState Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type I Statusl Length Codes Phase 1(mm/dd/yy) Code Phase I Code I Funds Funds Funds (2003) (2004)i(2005) 6th Type (MM/YY) <br /> 1 2 3 4 5 ! 6 7 8 9 10 11 1 12 13 14 15 16 17 18 19 20 21 <br /> 17 7 3 phases in project 32 P ' 0.5 C PE 6/1/04 1 I 45 301 75 I 751 I <br /> P RW 9/1/04' 1 75 50 125 75 501 <br /> Silver Lake Rd.-121st St.SE Ped Improv. T CN 7/1/05 TIA 180 120 300 300 <br /> Silver Lake Road-121st Street SE W <br /> to <br /> th Ave.SE <br /> SR <br /> 19 1 Design andtco construct ped s ria n project r 32,8 S.P 0.2 0 Totals PE 4/1/01 STP(E)' 149 2001 500 150 350 <br /> ( ) 300 <br /> ases <br /> P P I <br /> 254, 403 253 EA <br /> PE 4/1/04 1 CMAO 318 318 318 No <br /> 1-5/Snohomish River Bicycle-Ped Bridge CN 4/1/05 I IAC 250 2502501' <br /> Interstate 5 CN 4/1/05 DISCR. 3,000! ALEA 783 1,246 5,029 i 2,029 3,000 <br /> East Marine View Drive to Langus Riv'ft.Park <br /> i <br /> Design,cosntruct bike-ped bridge over Snohomish River Totals 3467' 1,033 1,500 6,000 253 318, 2,279 3,000 <br /> 19 2 2 phases in project 13 S 2 0 PE TCSP 486 134( 620 620 318! <br /> CN TCSP 3,214 886 4,100 1,000 3,1001 EA No <br /> N BNSF RR track relocation <br /> BNSF Milwaukee Yard,Old NP Main tracks <br /> Lowell Junction to Pacific Avenue <br /> Remove 3 sets tracks,build 1 adjacent to main line Totals . <br /> 3,700. 1,020 4,720 1620 3,100, <br /> 19 3 3 phases in project 32 S 2 i P PE 8/1/99!CMAQ 271 9 36 <br /> I 10 1 I CE No <br /> Interurban Trail North Extension CN 9/1/02 CMAQ 7141 238 952 500 1 <br /> Interurban-PUD right of way I 1 <br /> Madison Street to 44th Street <br /> Design and construct bicycle-pedestrian path I Totals ! 741 i 247 988 500 <br /> 19 4 2 phases in project 12 ' S 00 C PE 3/1/01 1 STP(S) 90 48 ' 138 CE <br /> P RW I No <br /> One-way to 2-way street conversion T CN 7/1/02 STP(S): 510 I I 273 783 283 <br /> Hoyt Avenue and Wetmore Avenue 0 1 <br /> 19th St.to 32nd St.;19th St.to 37th St. <br /> Design and construct 1-way to 2-way street conversions Totals 600 I 321 I 921 283 <br /> 19 5 2 phases in project 7 S 00 0 PE 1/1/03 <br /> CN 7/1/03 STP(U) 270 10,5001 10,770 1,735! 1,835 1,900; 3,800 CE No <br /> Annual Street Overlay Program <br /> Various streets within City limits <br /> •Various streets <br /> 'Resurfacing streets Totals I 270 10,500 10,770 1,835 1,900 1,900 3,800 <br /> 19 6 • STPE-0420(002) 1 phase in project 32 S 2 P CN 5/1/03 STP(E) 44 11' 55 55 CE <br /> 0I . No <br /> Riverfront Walkway Phase I ' <br /> Riverfront Walkway <br /> Lenora Street to Pacific Avenue <br /> ,Construct bicycle-pad path along Snohomish River I I Ii Totals I 44, j 11 55 55 <br />