Laserfiche WebLink
Washington State Department of Transportation Page 5 Six Year Transportation Improvement Program <br /> Agency Everett From 2003 to 2008 <br /> County No. 31 Hearing Date 6/26/02 <br /> City No. 420 Adoption Date 6/26/02 <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> 1 A. Federal Aid No. I Fund Source Information Expenditure Schedule Projects Only <br /> H. Bridge No. 1 �Federal Funding Local Agency <br /> C. Project Title I RAN <br /> D. Street/County Road Name or Number Improve-, Phase Federal,Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start ' Fund Cost by Fund ' State Local ! Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase 1 Code Funds Funds Funds (2003) (2004)I(2005) 6th Type (MM/YY) <br /> 1 2 3 4 1 5 6 7 8 9 10 11 12 13 I 14 15 16 i 17 I 18 19 20 21 <br /> 16 8 2 phases in project 6 ' P 2 C PE 2/1/03 75 75 251 25` 25 <br /> P CN 6/1/04 • 425 4251501 150 125 <br /> Colby Avenue Strwtscape Improvements T <br /> Colby Avenue W <br /> 19th Street to 41st Street S <br /> Design,construct slre.tscape improvements ! G Totals' 500 500 25 175 175 125 <br /> 17 1 3 phases in project 8 S 0.2 C PE 7/1/99 Discret. 650 FM- 650 EA <br /> , P RW 8/1/00 STP(U) 865 SIB 317! 1,182 I Yes <br /> California Street Overcrossing 1 T CN 12/1/00 STP(U)' 802 TPP 4,684 2,3821 7,868 3,2001 <br /> California Street I 0 CN FAST 2,200 2,200 <br /> West Marine View Drive to Terminal Avenue I <br /> Design and construct Arterial Overcrossing Totals 4,517 5,001! 2,3821 11,900 3,200 <br /> 17 2 2 phases in project 32 S,P 1.2 C PE ' 4/1/02 1 CMAQ 1 2931 471 340 340 <br /> !PP RW ! 10/1/03 CMAQ 200 501 250 250 I CE Yes <br /> Holly Drive Non-Motorized Improvements i T CN 5/1/04 CMAQ 722 6381 1,360 1,360. <br /> Holly Drive Non-Motorized Improvements i O 1j 1 2/1/04 <br /> 100th Street SW to Airport Road ' <br /> Design and construct pedestrian improvements I Totals 12151 735f 1950 3401 2501 1,360 <br /> 17 3 2 phases in project 32 ' P 0.2 C PE 4/1/04 ' ' 65' 65 50 15 <br /> P CN 6/1/05 335 335 335 <br /> 36th Street Ped,Bike,Landscape improvmts. T <br /> 36th Street 1 0 <br /> Broadway to Smith Avenue i ' <br /> Design,build bike,ped&landscape Improv. Totals I 400 400 1 50 3501 <br /> 17 4 2 phases in project i I <br /> 8 P 0.2 C PE I 6/1/05 2,000 2,000 5001 1,500 No <br /> ' 1 East Everett Ave.BNSF O'crossing-Railway Ave. P CN I 6/1/06 8,000, 8,000 8,000 I <br /> 1 Everett Evenue T <br /> East Grand Avenue to Railway Avenue 1 0 i j <br /> Design and construct arterial overcrossing Totals I i 10,000 10,000 5001 9,500 <br /> 17 5 2 phases in project 5 I P 1 0.1 C PE I 6/1/04 ! 181 11 29 29T <br /> P CN 6/1/05 AIP 2311 1391 370 370' No <br /> 37th Street Improvements , 0 I ' ' 1 1 <br /> Rucker Avenue to Wetmore Avenue <br /> Design,construct road widening,intersec.impr. Totals I 2491 150 399 291 370 <br /> 17 6 1 phase in project 32 P 0 P PE ' 1/1/05 ' 501 50 i 50'. <br /> T RW 1/1/06 1001 100 ! 50 No <br /> Smith Island bike/ped improvements 1 CN 7/1/06 3501 350 400 <br /> various arterials on Smith Island1 <br /> various <br /> arterial street improvements i Totals 1 I 501 450 500 50 450 <br />