Laserfiche WebLink
Washington State Department of Transportation Page 8 Six Year Transportation Improvement Program <br /> Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN From 2003 to 2008 <br /> County No. 31 Hearing Date 6/26/02 <br /> City No. 420 Adoption Date 6/26/02 <br /> MPO PSRC Resolution No. <br /> Project Identification 1 I Project Costs in Thousands of Dollars Federally Funded <br /> 1 A. Federal Aid No. 1 Fund Source Information Expenditure Schedule Projects Only <br /> 1 B. Bridge No. 1 Federal Funding i Local Agency i <br /> C. Project Title � I I R/W <br /> Func- I D. Street/County Road Name or Number Improve Phase Federal Federal State 1 i 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st I 2nd 1 3rd I thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds! Funds Funds (2003) (2004) (2005) 6th Type (MM/YY) <br /> 1 , 2 3 4 5 6 7 8 9 10 11 12 13 , 14 15 16 17 15 19 20 21 <br /> 19 I 14 2 phases in project 32 P 0.3 ! C PE 4/1/02 STPE 15 15' 30 15 <br /> Port of Everett is Lead Agency P CN 8/1/04 CMAQ 40 40 80 801 No <br /> Terminal Avenue Improvements I T <br /> Terminal Avenue I 0 <br /> (California Street to Bond Street <br /> Design and construct street&ped improvements I Totals 55'. 55 110 15 80 <br /> 19 15 2 phases in project 1 12 1 S 00 0 PE ! 1/1/03 <br /> 1 CN 5/1/03 , 2101 210 35 35, 35 105 No <br /> Pavement Marking Project <br /> Various locations within City limits <br /> Various streets to Various streets 1 <br /> Install pavement markings in various locationsII Totals! I 210' 210 35 35' 35 105 <br /> 19 16 2 phases in project 6 I S 00 C PE 1/1/03 I , <br /> 1 I P CN 5/1/03 CDBG 360' 360 60 60 60 180 No <br /> .---' Neighborhood Block Grants 1 T 1 <br /> --Ss. 1 Various locations within City limits 0 ! <br /> 'Various streets to Various streets <br /> • 'Construct public streets in various neighborhoods Totals 1 3601 I 360 60 60 60' 180 <br /> 19 17 ' 2 phases in project ! 6 P 00 C PE 1/1/03 ! I <br /> 1 P CN 5/1/03 2,4001 2,400 400 4001 400 1,200 No <br /> I 1 Neighborhood Traffic Mitigation Studies-Projects , T <br /> I Various locations within City limits 0 1 <br /> Various streets <br /> Install traffic enhancements in Neighborhoods Totals 2,400 2,400 400 400 400 1,200 <br /> 19 18 1 1 phase in project 12 • P ' 00 C CN iI 7/1/03 I , 120 120 20 201 20 60 <br /> ' P , 1 No <br /> Roadway Hazard Elimination Projects-city-wide I T ' <br /> Various locations within City limits 1 0 1 1 <br /> Various streets to Various streets <br /> 1 Remove and/or modify roadside hazards I Totals i 120 120 20 20 20 60 <br /> 19 19 2 phases in project 32 P f 0.3 J C PE I 6/1/04 25 25 I 25 <br /> Port of Everett is Lead Agency 0 CN ' 6/1/05 175, 175 1751 No <br /> 9e y 1 <br /> Port of Everett Public Access Walkway 1 <br /> Port of Everett South Terminal-sewer easement I , 1. <br /> Bond Street to Pigeon Creek#1 <br /> Construct bike-ped trail Totals 1 200 200 25 175 ' <br /> 19 20 2 phases in project 01 P 0.4 C PE ' 1/1/04 ' I TIA 60' 15' 75 751 J <br /> P CN 1 4/1/05 TIA 50011 100 600 6001 No <br /> 3rd Avenue SE Street Improvements T <br /> 3rd Avenue SE 0 1 1 i 1 ' <br /> 192nd Street SE to 95th Street SE • <br /> 1 Design and construct street improvements Totals I 5601115' 675 75 600 <br />