Laserfiche WebLink
Washington State Department of Transportation Page 9 Six Year Transportation Improvement Program <br /> Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN From 2003 to 2008 <br /> County No. 31 Hearing Date 6/26/02 <br /> City No. 420 Adoption Date 6/26/02 <br /> MPO PSRC Resolution No. <br /> !Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title I FVW <br /> Func- ! D. Street/County Road Name or Number Improve I Phase Federal Federal State I 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. ' Date <br /> Class Number F. Describe Work to be Done Type Status,Length,Codes Phase (mm/dd/yy), Code Phase Code ' Funds ' Funds , Funds (2003) (2004) (2005) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 21 1 2 phases in project 05 P 0.28 C PE 7/1/03 801 80 80 ' <br /> P CN 5/1/04500 5005001 No <br /> California Street Improvements , T I i I <br /> California Street 1 0 I <br /> Virginia Avenue to Maple Street <br /> Totals 580 580 801 500 <br /> 19 22 2 phases in project 05 P 1.7 ' C PE 8/1/04 ' 50 50 50' <br /> P CN 6/1/05 ; 1 250 250 250 Yes <br /> Upper Ridge&Lower Ridge Rd.street improvemt. T i 1 <br /> Upper Ridge,Lower Ridge,74th St.,76th St 0 1 <br /> Beverly Lane to 78th Street ! ! <br /> Construct street and sidewalk improvements Totals I 1 3001 30050 250 <br /> 19 23 3 phases in project 32 S 0.3 C PE 4/1/02 STPE 30' r 201 50 50 CE <br /> P RW 1/1/04 STPE 40! 10: 50 50 Yes <br /> VI <br /> Interurban Trail Completion T CN 6/1/04 STPE 200! 50 250 250 5/1/04 <br /> v 1 Colby Avenue 0 j <br /> 44th Street to 41st Street <br /> Design and construct bike&ped improvements Totals 2701 80 350 501 300 <br /> 19 24 ' 1 phase in project 12 P 00 C CN 5/1/03 [ 240 240 40. 40 40 120 <br /> P I No <br /> Traffic Signal Interconnect T ' <br /> Various locations within City limits 1 I <br /> Various streets to Various streets <br /> Construct traffic signal interconnect Totals 2401 240 40 40 40 120 <br /> 19 25 1 2 phases in project 12 S 00 C PE 1/1/03 <br /> P CN 6/1/03 I 900 900 1501 150 1501 450 No <br /> (Traffic Signal Improvements(City-wide) T <br /> Various locations within City limits <br /> Various streets to Various streets ' 1 I <br /> Design,construct,install traffic signals ' Totals`. I 900 900 150 150 150 450 <br /> 19 i 26 2 phases in project 12 S 00 ' C PE 3/1/03 ' <br /> P CN 9/1/03 I 6001 600 1501 150 150 150 No <br /> Developer Traffic Signals T <br /> ;Various locations within City limits <br /> I Various streets to Various streets 1 I <br /> !Design,destruct,install developer traffic signals Totals I j. 6001 600 150 1501 1501 150 <br /> 19 27 2 phases in project ! 12 1 P 0 0 PE 1 1/1/05 STP(U) 500 100 600 I 600 CE <br /> CNNo 4/1/06 STP(U)' ' 870 1301 1,000 i � 1,000', <br /> (TMS Upgrades ! I <br /> various locations city-wide i <br /> various traffic signals in Everett 1 j <br /> !replace central system with ITMS compat.System Totals 1,370 ! ' 230 1,600 1,6001 1 <br />