Laserfiche WebLink
Washington State Department of Transportation Page 10 Six Year Transportation Improvement Program <br /> Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN From 2003 to 2008 <br /> County No. 31 Hearing Date 6/26/02 <br /> City No. 420 Adoption Date 6/26/02 <br /> MPO PSRC Resolution No. <br /> ' f Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. 1 •Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title , R/W <br /> Func- D. Street/County Road Name or Number Improve-I Phase Federal Federal State I I 4th Required <br /> tional 'Priority ' E. Beginning MP or road-Ending MP or road ment Total Utility Project I Start Fund Cost by Fund State Local I Total 1st I 2nd 3rd ; ihru Envir. Date <br /> Class Number' F. Describe Work to be Done Type Status Length Codes Phase i(mm/dd/yy) Code Phase: Code Funds Funds I Funds (2003)I(2004) (2005) 6th Type (MM/YY) <br /> 1 2 1 3 4 5 6 7 8 I 9 10 11 12 13 14 15 16 17 18 l 19 20 21 <br /> 19 28 2 phases in project 6 S 00 0 PE ' I <br /> CN 5/1/03 360 360 60 60 60 180 No <br /> Sidewalk repair and replacement i <br /> Various locations within City limits 1 1 1 <br /> Various streets to Various streets I 1 <br /> Design.construct new and rehab.Exisling sidewalks Totals 360 360 60 60 60i 180 <br /> 19 29 2 phases in project 06 S 00 P PE 3/1/03 30 30 51 5 51 15 <br /> O CN 7/1/03 150 150 251 25 25 75 No <br /> Roadway Hazard Elimination Projects I <br /> Various locations within City limits <br /> r Various locations within City limits <br /> G Design and construct hazard elimination improvements 1, Totals 1 180 180 30 30 30 90 <br /> 19 29 2 phases in project 06 S 00 P PE 3/1/03 HES 151 15 30 5i 5 5 15 <br /> O CN 7/1/03 HES 751 75 150 25 25 25 75 CE No <br /> 1 City Entryway Landscaping and Signs 1 <br /> I Various Entryway Corridors within City limits <br /> 'Various Entryway to Various Entryway <br /> Design and Install Gateway landscaping and signs Totals 90, 90 180 301 30 30 90 <br /> 19 I 30 I 3 phases in project 32 P 00 P PE 5/1/02 I 1 120 120 101 201 30, 60 <br /> 0 RW I I <br /> Everett Non-Motorized Transportation Projects • CN 9/1/03 • <br /> 1,090. 1090 50 230 270 540 <br /> Various locations within City Limits'(see below) 1 <br /> • <br /> Various Locations to Various LocationsI <br /> Design-construct ped&Bike Paths&Bike lanes I Totals 1210' 1210 60 250 300 600 <br /> • Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, <br /> Bond Street,Lowell River Road,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW, <br /> 93rd Street SW,Dorn Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place, <br /> Cady Road,Fleming Street,75th Street and various shoreline public access projects <br />