Laserfiche WebLink
CITY OF EVERETT <br /> 2003 TO 2008 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Interstate Local Access <br /> 1. I-5 Corridor Improvement Study 1. Snohomish River Bike-Pedestrian Bridge <br /> 2. I-5 Median HOV Lanes&Auxiliary Lanes 2. BNSF RR Track Relocation <br /> 3. I-5/41St Street Interchange 3. Interurban Trail North Extension <br /> 4. I-5/US 2 Interchange 4. Hoyt-Wetmore 1-way to 2-way street conversion <br /> 5. I-5/ 100th Street SE HOV access/undercrossing 5. Annual Street Overlays(city-wide) <br /> 6. 1-5 / 112th Street SE Park&Ride,Flyer Stop,HOV Ramps 6. Riverfront Walkway Phase 1/Overcrossing <br /> 7. I-5 /Downtown Everett interchange improvements 7. East Everett Pedestrian Walkway <br /> 8. I-5 /Smith Island Interchange 8. 41St Street Bike-Ped Connector Study <br /> 9. I-5/East Marine View Drive Interchange Improvements 9. 13th Street Bicycle-Pedestrian Improvements <br /> 10. I-5 Snohomish Corridor Action Plan(SnoCAP) 10. 10th Street Pedestrian Improvements <br /> Freeways 11. 106th Place SE Improvements <br /> 1. SR 526/Hardeson Road Interchange Study 11. BNSF RR Crossing safety improvements <br /> 12. Terminal Avenue Pedestrian Improvements <br /> Principal Arterials 13. Pavement Marking Project <br /> 1. 19th Avenue SE(SR 527)Improvements 14. Neighborhood Block Grants <br /> 2. Evergreen Way Improvements, 112th St. SW to Airport 15. Neighb. Traffic Mitigation studies&projects <br /> 3. Evergreen Way Improvements,41st to 47th Street 16. Hazard Elimination& Safety Projects <br /> 4. East Marine View Drive Improvements 17. Port of Everett Public Access Walkway <br /> 5. Broadway/Beverly Blvd. Intersection Improvements 18. 3rd Avenue SE Street Improvements <br /> 6. Broadway Corridor Improvements 19. California Street Improvements <br /> 7. HES Projects(Ev. Mall Way,Broadway, Colby) 20. Upper&Lower Ridge Road Street Improv. <br /> 8. Evergreen Way HOV Emphasis Improvements 21. Interurban Trail-44th to 41St Street <br /> 9. SR 525 Improvements 22. Traffic Signal Interconnect <br /> 10.Arterial Needs Study 23. Traffic Signal Improvements <br /> 24. Developer Traffic Signals <br /> Minor Arterials 25. ITMS Upgrades <br /> 1. 415t Street Overcrossing 26. Sidewalk repair and replacement <br /> 2. Lowell Neighborhood Bypass 27. City Entryway landscaping and signs <br /> 3. 112th Street SW Street Improvements(Airport Rd/to SR 99) 28. Everett Non-Motorized Transp.Projects <br /> 4. 112th Street SW-SE Street Improvements(SR 99 to 3rd SE) (Various streets and locations) <br /> 5. 112th Street SE Street Improvements(3rd Ave. SE to SR 527) <br /> 6. 116th Street SE Street Improvements <br /> 7. 100th Street SW Street Improvements Transit <br /> 8. Colby Avenue Streetscape Improvements 1. Bus Replacements-2003 to 2008 <br /> 2. Vehicle Maintenance Capitalization <br /> Collector Arterials 3. Regional Fare Coordination Project <br /> 1. California Street Overcrossing 4. Transit Operations&Maint.Facil. Siting Study <br /> 2. Holly Drive Non-Motorized Improvements 5. Boeing Mitigation Park&Ride Lots <br /> 3. 36th Street Ped,Bike and Landscape Improvements 6. Bus Cleaning Facility <br /> 4. East Everett Avenue BNSF Overcrossing <br /> 5. 37th Street Improvements <br /> 6. Smith Island Bike and Pedestrian Improvements HOV Projects <br /> 7. Silver Lake Road-121st Street SE Ped Improvements 1. Everett Station Bicycle Demo Project <br /> 2. Everett Station Commuter Rail Improvements <br /> Projects shown in bold type were not included in 3. Everett Station Park&Ride Parking Structure <br /> The City's 2002-2007 Six Year TIP 4. South Everett Transit Center <br /> 5. North Everett Transit Center <br /> 6. Implementation of State CTR Law <br />