Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program
<br /> Agency Everett From 2003 to 2008
<br /> County No. 31 Hearing Date 6/26/02
<br /> City No. 420 Adoption Date 6/26/02
<br /> MPO PSRC Resolution No.
<br /> Project Identification I I Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. i Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding 1 Local Agency
<br /> •
<br /> C. Project Title I 1 1 R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State I 1 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road I ment I I Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number. F. Describe Work to be Done Type (Status'Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2003) (2004) (2005) 6th Type (MM/YY)
<br /> I 2 I 3 4 1 5 I 6 7 8 I 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 11 1 STPUL-1998(017) 2 phases in project 31 S I 8 PE 5/1/99 STP(U) 1,273 295 1,568 125 CE No
<br /> various
<br /> Interstate 5 Corridor Improvement Study i 1 ;
<br /> 1-5
<br /> 112th St.SE to 12th St.NE
<br /> Design Report of 1-5 corridor improvements Totals I 1,273'. 1 1 2951 1,568 125 1
<br /> 11 2 3 phases in project 4 S 5.6 •' 0 PE 1/1/99 118,300 I 1 18,300 8,300 10,000, 1
<br /> various RW 11/1/03 20,0001, 20,000 10,000 10,000
<br /> 1-5 Median HOV Lanes and Auxiliary Lanes CN 5/1/05 WSDOT 191,7001 191,700 70,000.121,700
<br /> 1-5
<br /> SR 529(N.Broadway)to E.Marine View Drive ' '
<br /> Design and construct Median HOV and GP aux.lanes Totals 230,000 230,000 18,300 1 20,000!70,000 121,700
<br /> 11 3 3 phases in project 3 P 0.1 0 PE 1/1/02 STP(U)• 1,500 WSDOT, 2,000 1,000 4,500 1,500 13,000 i
<br /> 5/630 P RW • 11/1/03 STP(U) 300 WSDOTI 2,000 2,300 500 1,8001 EA 1/1/05
<br /> I-5/41st Street SE Interchange T CN May-05 STP(U) 3,200 WSDOT' 6,000 24,000 33,2001 10,000 23,200
<br /> 1-5,41st Street
<br /> 1-5 at 41st Street to 1-5 at 41st Street I
<br /> 1
<br /> Design and construct Interchange Improvements Totals 5,000 10,0001 25,000 40,000 2,000 4,800 10,000 23,200
<br /> 11 4 3 phases in project i 3 I P 0.3 0 PE 1 1/1/04 WSDOT 7,0001 7,000 4,000 3,000
<br /> 5/640 I RW I 6/1/04 WSDOT 15,0001 15,000 12,500 2,500 EA 1/1/05
<br /> 1-5/US 2 Interchange I CN 6/1/05 WSDOT, 28,000, 28,000 28,000
<br /> 1-5,US 2,Hewitt Avenue,Everett Avenue
<br /> 1
<br /> 1-5 at US 2 Interchange to I-5 at US 2 Interchange ,
<br /> •Improve On-ramps,Local Arterials,&Interchange Totals 50,0001 1 50,000 4,000 15,500 30,500
<br /> 11 5 3 phases in project 1 1 P ! 0.1 I O PE 9/1/05 WSDOT 5,0001 5,000 2,000 3,000
<br /> ' RW 11/1/06 WSDOT 2,0001 2,000 2,000
<br /> 1-5/100th Street SE HOV Access/undercrossing I CN 5/1/08 i WSDOT 25,5001 3,2001 28,700 28,700
<br /> 1-5,100th Street SE
<br /> SR 527 to South Everett Transit Center area l % '
<br /> Design and construct HOV access/undercrossing Totals 1 . 32,500 3,200 35,700 2,000 33,700
<br /> 11 6 3 phases in project 3 S 0.1 0 PE 1/1/99 1 2,5471 252
<br /> 5/620 (Sound Transit is lead on project) I P RW 1/1/00 4271 205
<br /> 1 1-5/112th St.Direct Access HOV-P&R/Flyer Stop T CN 1/1/03 9,969 8,451 750
<br /> 1-5,112th Street SE 25,705 25,705
<br /> 1-5/112th Street SE to I-5/112th Street SE
<br /> Design/Construct HOV Ramps,P&H Lot,Flyer Stop Totals 25,705 25,705 2,974 10,426 8,451 750
<br /> 11 7 3 phases in project 3 P ' 1.1 0 PE 1/1/05- - 4,000 4,000 4,000
<br /> , RW 6/1/05 ' 6,000 ' • 6,000 2,000 4,000
<br /> 1-5/Downtown Everett Interchange Improvements CN 6/1/09 , 20,000 5,000 25,000 25,000
<br /> I-5 at Pacific,Hewitt,Everett Avenues
<br /> Pacific Avenue to Everett Avenue
<br /> Major reconfiguration of I-5 o8ramps for Downtown Totals 1 I 30,000, 5,000. 35,000 I j 6,0001 29,000