|
Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program
<br /> Agency Everett From 2003 to 2008
<br /> County No. 31 Hearing Date 6/26/02
<br /> City No. 420 Adoption Date 6/26/02
<br /> MPO PSRC Resolution No.
<br /> Project Identification I I Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. ' Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. 'Federal Funding' Local Agency R/1N
<br /> C. Project Title
<br /> ' D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road ' ment Total Utility Project Start Fund 'Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status'Length!Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2003) (2004) (2005) 6th Type (MM/YY)
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 11 8 • 3 phases in project I 1 1 P I 0.3 10 PE 4/1/05 !WSDOT 1,000' 1,000' 2,000 2,0001
<br /> RW 6/1/06, 1 I WSDOT 1,000 2,000 3,000 3,000
<br /> 1-5/Smith Island Freeway Interchange CN 5/1/07! ' I WSDOT1 8,0001 12,000 20,000 20,000
<br /> 1-5 at 12th St.NE or other location on Smith Island II
<br /> 12th St.NE,or other location north of 12th St.NO
<br /> Design and construct freeway interchange Totals' , 10,000 15,000 25,000 ' 2,000 23,000
<br /> 11 9 3 phases in project 3 P ' 0.3 0 PE 6/1/0T WSDOT I 3,000 1,000 4,000 4,000
<br /> RW 11/1/08 WSDOTI 1,500 500 2,000 2,000 1/1/10
<br /> i-S/East Marine View Dr.Frwy.Interchange CN 5/5/10 ' WSDOT 17,000, 7,000 24,000
<br /> I-5 at East Marine View DriveFMSIB 1 5,0001 5,000
<br /> i
<br /> I-s 04 E.Marine View Dr.
<br /> Add on and otf-ramp to and from the north Totals 126,5001 8,500 35,000 1 6,000
<br /> 11 10 1 phase in project 31 P I Plan 10/1/01 STP(U) 300 WSDOT1 2,000 200 2,500 300 11,000 1 1,000 I EA
<br /> I-5 SnoCAP Action Plan 1 1
<br /> Interstate 5 and other State highways,connectors
<br /> 1-5,US2,SR 9,SR 524,SR 96,SR 528
<br /> _ Action Plan for improvements required ! I Totals, 300 2,000 200 2,500 300 1,000 1,000
<br /> 12 i 1 1 phase in project 31 ! P 0 I PE ' 9/1/04 ! 250 250 250
<br /> 526/14 No
<br /> SR 526/Hardeson Road Interchange Study
<br /> 1SR 526 and Hardeson Road
<br /> SR 526/Hardeson Rd. To SR 526/Hardeson Rd. ', 1 ,
<br /> Study possible interchange improvements i Totals i 250 250 250
<br /> 14 1 4 phases in project 4 S 1.5 ! C PE 3/1/94 1401 3,3791 3,519 500
<br /> P RW I 7/1/98 4,146. 4,146 2000 EIS Yes
<br /> 19th Avenue SE(SR 527)Improvements T CN 6/1/03 15,950; 899 16,849 10,000 6,849
<br /> 19th Avenue SE(SR 527) I 0 l '
<br /> 112th Street SE to 132nd Street SE ,
<br /> Design and construct addit.lanes,signal improv.,etc. Totals ' 16,090 8,424, 24,514 2,500. 10,000 6849
<br /> 14 • 2 2 phases in project 4 S 0.55 C PE ' 4/1/99 1 ' 28 52 80
<br /> P CN 7/1/02 TIA 387 539 926 386 I 540 No
<br /> Evergreen Way Imrpov.(HOV-Emph.Lane Widen.) I T I
<br /> Evergreen Way 0
<br /> 112th Street to Airport Road I
<br /> Design and construct rosdway widening to seven lanes I Totals 4151. 591 1,006 386 540 I
<br /> 14 3 3 phases in project 4 ' S 0.6 C PE 9/1/00 1 AIP 119' 401, 159 159'
<br /> P RW ' 10/1/01 , 255, 851 340 3401 i No
<br /> Evergreen Way Widening T CN 5/1/03 I 9001 351 1251 951! 3001
<br /> 'Evergreen Way-Rucker Avenue , 0 ,
<br /> 41st Street to 47th Street '
<br /> Design and construct widening from 5 to 7 lanes Totals 1 1274- 476, 1750 1450. 300 I
<br />
|