My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5106
>
Resolutions
>
Resolution 5106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 11:32:33 AM
Creation date
2/21/2017 11:32:32 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5106
Date
9/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br /> Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program <br /> Agency Everett From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State I 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds_ Funds Funds 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 -. 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 9 3 phases in Project 1 P 5 C PE 12/1/91 <br /> P RW 9/1/95 Yes <br /> SR 525 Corridor Projects T CN 8/1/99 35,000 35,000 10,000 25,000 EIS <br /> SR 525 Corridor Projects 0 <br /> SR 526 to 1-5 Sep-95 <br /> Roadway improvements,new interchange at SR 99 Totals 35,000 35,000 10,000 25,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.