My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/11/16 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/11/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 4:35:53 PM
Creation date
2/21/2017 4:34:20 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. In reviewing plans for individual phases of development and individual buildings, <br /> the Planning Director shall have the authority, if he deems it necessary to <br /> determine consistency with the character and quality represented in the site <br /> development plan identified as Exhibit A and the "Port Gardner Wharf Design <br /> Guidelines," to retain the services of an independent architect with appropriate <br /> expertise as an independent third party. The selection of the architect shall be <br /> mutually agreed upon by the City and the applicant. <br /> 12. The applicant shall provide to the City a detailed parking management plan for <br /> approval by the Planning Director and City Engineer for each phase of <br /> development, prior to the issuance of any building permits within each phase. <br /> This requirement shall not apply to demolition permits, or permits for street, <br /> utility and public access infrastructure improvements. The City shall have the <br /> authority to approve, modify or reject the parking management plan as necessary <br /> so adequate parking is provided for the activities anticipated within the project. <br /> Provisions shall be made to accommodate the public for normal weekend and <br /> peak season activities. The applicant shall not be required to provide parking on- <br /> site to accommodate anticipated special events with an extraordinary parking <br /> demand, such as 4th of July fireworks exhibitions or Fresh Paint, but shall provide <br /> for alternative means of accommodating anticipated public access such as transit <br /> or shuttle service from off-site parking facilities. <br /> 13. The off-street parking required for residential use shall be 1.8 parking stalls per <br /> dwelling unit, provided that not more than 60 percent of all dwellings have 3 or <br /> more bedrooms. The parking required for residential uses shall be addressed in <br /> the parking management plan for each phase of redevelopment. For each phase of <br /> residential redevelopment after the first phase, the Planning Director and City <br /> Engineer shall have the authority to require a greater number, or allow a lesser <br /> number of parking spaces, based upon the mix and size of residential dwelling <br /> units, the presence or absence of regular public transit service, and experience <br /> with residential parking demand in preceding phases of development. <br /> 14. All required parking for residential use shall be located within enclosed structures. <br /> 15. The public access esplanade abutting water's edge in the diagram for the open <br /> space network proposed in the notebooks submitted to the Planning Department <br /> October 7, 2005, shall be constructed concurrent with the first phase of buildings <br /> in the North Marina Redevelopment Area. The Planning Director may allow for <br /> interim level of improvements in areas where future phases of development would <br /> require demolition of public access improvements. Any such interim <br /> improvements shall be replaced with permanent improvements consistent with the <br /> draft Port Gardner Wharf design guidelines concurrent with the phase of <br /> development abutting the public access facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.