Laserfiche WebLink
DEC-20-2005 TUE 03:28 PM NWA GEOSCIENCES FAX NO. 4257742714 P. 08 <br /> 5 <br /> Geotechnical Engineering Service9 Proposal No.: P 5525 <br /> Everett Sewer Replacement"Q" Revised Date: 20-Dcc-05 <br /> Everett,Washington Client: CHS <br /> By:TOA <br /> DRILLING SUBCONTRACT-EXPLORATIONS ALONG APPROACH FILL WALLS <br /> Ratc Quantity Subtotal <br /> 6 Borings Truck-Mounted Drill Rig <br /> Mob&Demob $500.00 /each I total S500 <br /> Pavement Cores 5250.00 /each 4 total S 1,000 <br /> Drilling-Hollow Stem Auger 522.00 /R 85 ft 51,870 <br /> Extra Samples;SPT 520.00 /ample 27 samples $540 <br /> Setup&Moving 515000 Thr 4 hrs $600 <br /> Drill Cuttings Drum&Disposal 5150.00 Idtum 4 drums $600 <br /> Bentonite Chips(hole backfill) 58.00 lack 32 sacks $256 <br /> Ready Mix Concrete(surface patch) 58.00 /sack 4 sacks S32 <br /> Subtotal 55,398 <br /> State and Local Saks'fax 8.9% 5480 <br /> Subtotal $5,878 <br /> Subcontract Contingency 0.0% SO <br /> Drilling Subcontract Total 55,878 <br /> TRAFFIC CONTROL SUBCONTRACT <br /> Rate Quantity Subtotal <br /> Work Ahead Signage for Partial Lane Closures where necessary <br /> Signnge per approval Traffic Control Plans $300.00 /day 1 day 5300 <br /> Subtotal 5300 <br /> State and Local Sales Tax 8.9% 527 <br /> Subtotal $327 <br /> Subcontract Contingency 5300.00 /day 0 day $0 <br /> Traffic Control Subcontract Totul $327 <br /> SUBCONTRACTORS TOTAL 56,205 <br /> 29 <br />